groundranger
Active · latest filing Sep 2026Residential

500 W 7th St

Dallas, TX 75208

Home gets foundation repairs and a garage EV charger

Permits for 500 W 7th St cover residential foundation repairs and installation of a 240-volt electric vehicle charger in the garage. The foundation repair permit was filed July 13, 2026, and the charger permit was filed September 15, 2026.

Summarized from City of Dallas records · updated Sep 15, 2026

Projects
3
3 filings
Latest filing
Sep 15, 2026
since Jul 13, 2026
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Install 240v electric vehicle charger for garage

    Install 240v electric vehicle charger for garage

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-005670
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installing 2 pad and block supports. installing 16 lf of joist. installing 10 lf of beam. reset/re-shimming the foundation with steel shimper engineer report

    Installing 2 pad and block supports. installing 16 lf of joist. installing 10 lf of beam. reset/re-shimming the foundation with steel shimper engineer report

    City of Dallas permitResidential Foundation Repair
    Record
    RES-FDN-26-000552
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior and exterior remodel(changing 2 doors) no interior lay out change

    Interior and exterior remodel(changing 2 doors) no interior lay out change

    City of Dallas permitBuilding (BU) Single Family Renovation
    Record
    2001091117
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 500 W 7th St

What is happening at 500 W 7th St in Dallas?

City of Dallas permits cover foundation repairs and a 240-volt electric vehicle charger for the garage. The filings were made July 13 and September 15, 2026.

Is a new home being built at 500 W 7th St?

The available permits describe foundation repairs and a garage EV charger installation, not construction of a new home.

Is an EV charger being installed at 500 W 7th St?

Yes. Permit RES-ELC-26-005670, filed September 15, 2026, describes installing a 240-volt electric vehicle charger for the garage.

What foundation work is planned at 500 W 7th St?

Permit RES-FDN-26-000552, filed July 13, 2026, describes installing two pad-and-block supports, joist and beam sections, and resetting and reshimming the foundation.

When were permits filed for work at 500 W 7th St?

The foundation repair permit was filed July 13, 2026. The garage EV charger permit followed on September 15, 2026.

What are the permit numbers for 500 W 7th St?

The City of Dallas permits are RES-FDN-26-000552 for foundation repair and RES-ELC-26-005670 for the garage EV charger.

Also being built nearby

All of 75208
Get alerts for 500 W 7th St