530 Centre St
Dallas, TX 75208
530 Centre St: 1 project on record
City of Dallas lists 1 filing across 1 project at 530 Centre St, Dallas, TX 75208. The most recent, filed October 21, 2020, covers: “Install grease or sand trap only”.
Compiled from City of Dallas records · updated Oct 21, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2020
- since Oct 21, 2020
- Largest scope
- —
- Listed value
- $2
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 530 Centre St
What is being built at 530 Centre St?
The latest filing (City of Dallas permit 2010213018, October 21, 2020) covers install grease or sand trap only.
How many permits and filings does 530 Centre St have?
1 filing across 1 project, from October 21, 2020 to October 21, 2020.
How much is the construction at 530 Centre St worth?
Permits at this address list about $2 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Piap Properties in Dallas?
530 Centre St is about 194 m from Piap Properties (436 W Jefferson Blvd). Its latest filing is for install grease or sand trap only.
Is there other construction near 530 Centre St?
Yes. Nearby filings include 533 W Jefferson Blvd (no work needs oncor to turn my lights on, Feb 19, 2026); 523 W Jefferson Blvd (mcr separating space by address, no structural changes are being made, Oct 1, 2025); 528 W 12th St (mcr no/battery residential solar pv system installation, Aug 5, 2026).
How do I get alerts for new permits at 530 Centre St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 533 W Jefferson BlvdFeb 19, 2026No work needs oncor to turn my lights on · 109 m away
- 523 W Jefferson BlvdOct 1, 2025Mcr separating space by address, no structural changes are being made · 109 m away
- 528 W 12th StAug 5, 2026Mcr no/battery residential solar pv system installation · 123 m away
- 436 Centre StMar 25, 2026Demolition of the existing sidewalk concrete in the front of the building (approx. 180 sq ft) no approach.build a new sidewalk concrete in the front of the building · 169 m away
- 611 W Jefferson BlvdOct 20, 2020Install new hvac · 182 m away
- 424 Centre StFeb 3, 2026Running a new gas line in 1” black iron to from gas meter to furnace in attic. furnace is the only gas appliance · 189 m away
- 622 W Jefferson BlvdOct 27, 2020Gas test · 191 m away
- 621 W 12th StNov 3, 2026Install electrical for new construction · 191 m away
- 408 Centre StJan 10, 2023Interior remodel only- 408 centre st- second floor · 192 m away
- 423 Centre StJun 24, 2024Remodel finish out com-423 centre st · 192 m away
- 610 W 12th StDec 18, 2020Install water heater · 192 m away
- 436 W Jefferson Blvd · Piap Properties LLCOct 7, 2025Tide laundromat store #4 — renovation/alteration — project consists of existing tenant lease space formerly operated as a laundromat and retail spaces to be renovated into new laundromat facilities of 4,713sf total · 194 m away