603 W Pembroke Ave
Dallas, TX 75208
603 W Pembroke Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 603 W Pembroke Ave, Dallas, TX 75208. The most recent, filed June 9, 2025, covers: “Install new washer box , install water heater”.
Compiled from City of Dallas records · updated Jun 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 9, 2025
- since Jun 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 603 W Pembroke Ave
What is being built at 603 W Pembroke Ave?
The latest filing (City of Dallas permit RES-PLM-25-001282, June 9, 2025) covers install new washer box , install water heater.
How many permits and filings does 603 W Pembroke Ave have?
2 filings across 2 projects, from June 9, 2025 to June 9, 2025.
Is there other construction near 603 W Pembroke Ave?
Yes. Nearby filings include 638 W Pembroke Ave (existing approach will be widened and repoured along with sidewalk, Oct 6, 2025); 614 W Brooklyn Ave (gas relay or repair with test, Sep 30, 2020); 618 W Brooklyn Ave (gas relay or repair with test, Oct 1, 2020).
How do I get alerts for new permits at 603 W Pembroke Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 638 W Pembroke AveOct 6, 2025Existing approach will be widened and repoured along with sidewalk · 60 m away
- 614 W Brooklyn AveSep 30, 2020Gas relay or repair with test · 100 m away
- 618 W Brooklyn AveOct 1, 2020Gas relay or repair with test · 102 m away
- 626 W Brooklyn AveOct 12, 2020Gas relay or repair with test · 106 m away
- 615 Delaware AveAug 27, 2026Complete demolition and lawful off-site disposal of a single-story residential structure of approximately 1,236 square feet, including the structure, concrete foundation/slab, attached walkway, driveway, and any remaining contents. also includes demolition and disposal of a detached accessory building of approximately 216 square feet, including its structure, concrete foundation, and any remaining contents. all debris to be hauled to a permitted disposal facility. upon completion, the lot will be rough graded using existing on-site soils to establish positive drainage. utility locates and disconnects to be completed and verified prior to demolition. no hazardous material abatement, soil importation, or tree removal is included in this scope. contractor to coordinate all required inspections and secure permit closure at completion · 108 m away
- 630 W Brooklyn AveSep 24, 2020Gas relay or repair with test · 109 m away
- 632 W Brooklyn AveOct 1, 2020Gas relay or repair with test · 110 m away
- 607 W Brooklyn AveSep 29, 2020Gas relay or repair with test · 111 m away
- 634 W Brooklyn AveOct 22, 2020Gas relay or repair with test · 112 m away
- 611 W Brooklyn AveNov 9, 2020Gas relay or repair with test · 112 m away
- 615 W Brooklyn AveOct 22, 2020Gas relay or repair with test · 113 m away
- 619 W Brooklyn AveSep 21, 2020Gas relay or repair with test · 114 m away