615 N Clinton Ave
Dallas, TX 75208
615 N Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 615 N Clinton Ave, Dallas, TX 75208. The most recent, filed June 2, 2025, covers: “Reroof certainteed landmark weathered wood 30 year warranrty”.
Compiled from City of Dallas records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 615 N Clinton Ave
What is being built at 615 N Clinton Ave?
The latest filing (City of Dallas permit RES-ROOF-25-000155, June 2, 2025) covers reroof certainteed landmark weathered wood 30 year warranrty.
How many permits and filings does 615 N Clinton Ave have?
1 filing across 1 project, from June 2, 2025 to June 2, 2025.
Is there other construction near 615 N Clinton Ave?
Yes. Nearby filings include 607 N Clinton Ave (no work, clean and show, no cost, Aug 14, 2026); 614 N Clinton Ave (installing a 4 ton gas horizontal hvac unit, Jul 9, 2025); 1301 W Davis St (gas test, Nov 18, 2020).
How do I get alerts for new permits at 615 N Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 607 N Clinton AveAug 14, 2026No work, clean and show, no cost · 11 m away
- 614 N Clinton AveJul 9, 2025Installing a 4 ton gas horizontal hvac unit · 13 m away
- 1301 W Davis StNov 18, 2020Gas test · 20 m away
- 602 N Clinton AveSep 24, 2020Electrical remodel · 21 m away
- 1313 W Davis StOct 27, 2026This permit is being submitted to correct the city of dallas record regarding the existing bathroom door location. the 2019 certificate of occupancy floor plan shows the bathroom door opening into the rear room; however, the existing bathroom door opens into the hallway. at the direction of city of dallas zoning and planning staff, this remodel permit is being submitted so the floor plan and city records accurately reflect the existing bathroom door location · 24 m away
- 1314 W Davis StMay 8, 2026Mcr interior partition wall at back of space. interior partition walls (partial height) at open area. re-paint existing walls · 36 m away
- 619 N Winnetka AveOct 7, 2026New hvac and ductwork · 116 m away
- 615 N Winnetka AveNov 18, 2026Install a mini split · 116 m away
- 623 N Winnetka AveJun 26, 2026Nsfaa replacing 4 windows (like for like) · 117 m away
- 623 N Edgefield AveSep 22, 2025Reroof to malarkey natural wood asphalt shingle and replace decking with 7/16 osb radiant barrier decking · 117 m away
- 627 N Winnetka AveJun 1, 2026Gas pressure testcustomer is getting an atmos account · 117 m away
- 631 N Winnetka AveMar 23, 2026Sewer relay · 118 m away