639 Brooks Ave
Dallas, TX 75208
Residential HVAC system replacement at 639 Brooks Ave
A residential permit covers replacement of a complete 4-ton gas HVAC system at 639 Brooks Ave. The City of Dallas filing is dated August 19, 2026, under permit RES-MEC-26-004566.
Summarized from City of Dallas records · updated Aug 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 19, 2026
- since Aug 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 639 Brooks Ave
What is being done at 639 Brooks Ave?
A City of Dallas residential mechanical permit covers replacement of a complete 4-ton gas HVAC system. The filing date is August 19, 2026.
Is a new HVAC system being installed at 639 Brooks Ave?
The permit description says a complete 4-ton gas HVAC system is being replaced. It does not specify whether the replacement equipment is new.
When was the HVAC permit filed for 639 Brooks Ave?
The City of Dallas filing is dated August 19, 2026.
What is the permit number for work at 639 Brooks Ave?
The permit number is RES-MEC-26-004566. It is listed as a residential mechanical permit.
Is a new home being built at 639 Brooks Ave?
The available filing describes replacement of a complete 4-ton gas HVAC system. It does not list a new home construction project.
Also being built nearby
All of 75208- 1007 S Van Buren AveJul 30, 2026Replace existing roof with new roof to include new shingles and underlayment · 116 m away
- 602 Brooks AveApr 7, 2026Gas test to release gas mirer · 140 m away
- 615 Delaware AveAug 27, 2026Complete demolition and lawful off-site disposal of a single-story residential structure of approximately 1,236 square feet, including the structure, concrete foundation/slab, attached walkway, driveway, and any remaining contents. also includes demolition and disposal of a detached accessory building of approximately 216 square feet, including its structure, concrete foundation, and any remaining contents. all debris to be hauled to a permitted disposal facility. upon completion, the lot will be rough graded using existing on-site soils to establish positive drainage. utility locates and disconnects to be completed and verified prior to demolition. no hazardous material abatement, soil importation, or tree removal is included in this scope. contractor to coordinate all required inspections and secure permit closure at completion · 159 m away
- 732 W Clarendon DrMay 16, 2025Gas test · 159 m away
- 718 W Clarendon DrDec 9, 2025Gas tesgas metert to set · 161 m away
- 606 Delaware AveNov 17, 2020Enclose back porch · 164 m away
- 1021 Griffith AveFeb 16, 2026Double clean out install · 164 m away
- 611 Griffith AveDec 9, 2025Fix gas leak and did gas tests · 176 m away
- 609 Griffith AveDec 9, 2025Fix gas leak and did gas tests · 181 m away
- 520 Brooks AveFeb 13, 2026We're looking to reconnect natural gas service and we are putting the pipe system under pressure to pass inspection · 203 m away
- 735 Nolte DrJul 25, 2026A was leak was detected, i will be doing a leak detection a repair it. i will have it ready for inspection on test · 205 m away
- 930 S Vernon AveAug 21, 2026Gas test · 219 m away