709 S Madison Ave
Dallas, TX 75208
Dallas permits indicate demolition of homes at 709 S Madison
City of Dallas permits indicate demolition of single-family homes at 709 S Madison Ave, with each description noting about 900 square feet and removal of the existing slab. The permits were filed September 4 and September 30, 2026; the records do not provide details about what may be built afterward.
Summarized from City of Dallas records · updated Sep 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 30, 2026
- since Sep 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 709 S Madison Ave
What is being built at 709 S Madison Ave?
The Dallas permit records indicate demolition of single-family homes, not what may be built afterward. The two demolition permits were filed September 4 and September 30, 2026.
Are homes being demolished at 709 S Madison Ave in Dallas?
Yes. Two City of Dallas permit descriptions concern demolition of single-family homes and removal of the existing slab. Each description notes about 900 square feet.
When were demolition permits filed for 709 S Madison Ave?
Permit RES-DEM-26-000846 was filed September 4, 2026, and permit RES-DEM-26-000911 was filed September 30, 2026.
Is a new home planned at 709 S Madison Ave?
The records list a new-home category, but the available permit descriptions are for demolition only. They do not provide details about a new home.
What is being demolished near Ionna's Dallas 12th St. Charging Hub?
At 709 S Madison Ave, about 227 meters from the charging hub, Dallas permits indicate demolition of single-family homes. The permits were filed September 4 and September 30, 2026.
Also being built nearby
All of 75208- 314 W Brooklyn AveFeb 25, 2026Install 50 gallon gas water heater in closet · 24 m away
- 801 S Madison AveFeb 10, 2026Replace pool fill backflow device · 89 m away
- 239 W Brooklyn AveNov 11, 2025Gas test · 112 m away
- 237 W Brooklyn AveOct 28, 2025Gas test · 115 m away
- 339 W Page AveOct 20, 2020Remove existing roof and install new roof · 139 m away
- 221 W Brooklyn AveNov 10, 2026221 w brooklyn ave - new 4 plex · 141 m away
- 232 W Pembroke AveMar 13, 2026Replacing 200 amp meter base, 200 amp panel, grounding and surge protection · 152 m away
- 213 W Brooklyn AveJul 10, 2026Residential sfd demolition: 1240 sq ft · 154 m away
- 210 W Brooklyn AveAug 1, 2025Plumbing · 156 m away
- 208 W Brooklyn AveAug 25, 2025Duplex ~ #208 & 210 w brooklyn ave~ # 208 ~ install 4-ton hvac system with electric heat ~ # 210 ~ install 4-ton hvac system with electric heat · 159 m away
- 209 W Brooklyn AveNov 16, 2026Gas test · 160 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 168 m away