groundranger
Recent · latest filing Jul 2026Residential

719 S Montreal Ave

Dallas, TX 75208

Permit covers a container bathroom at 719 S Montreal Ave

A City of Dallas permit filed April 7, 2026, covers placing a prefabricated shipping container in the rear yard as an accessory bathroom structure. The scope includes a toilet, shower, plumbing and electrical work. Later permits cover electrical inspection on June 18 and plumbing work on July 14, 2026.

Summarized from City of Dallas records · updated Jul 14, 2026

Projects
4
4 filings
Latest filing
Jul 14, 2026
since Apr 7, 2026
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Plumbing work / service inspection

    Plumbing work / service inspection

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-007270
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Electrical installation for bathroom facility/total building area (sq ft) 180estimated total cost (job value) description of change of scope electrical inspection of existing prefabricated container installed on site.verify 60 amp feeder to sub panel and all existing electrical installation

    Electrical installation for bathroom facility/total building area (sq ft) 180estimated total cost (job value) description of change of scope electrical inspection of existing prefabricated container installed on site.verify 60 amp feeder to sub panel and all existing electrical installation

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-003602
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Nsfaa permit description of workinstallation of a prefabricated container accessory structure in the rear yard of the property to be used as a bathroom facility.scope of work includes placement of one shipping container unit on an approved foundation system. interior improvements will include construction of a bathroom containing a toilet and shower. work will include installation of plumbing lines for water supply, sanitary sewer connection, and venting tied into the existing plumbing system.electrical work will include installation of lighting, receptacles, and an exhaust fan connected to the existing electrical service panel.work will include interior wall framing, insulation, moisture-resistant wall finishes, waterproof shower enclosure, and flooring appropriate for a bathroom environment.all work will comply with local building codes, plumbing codes, and electrical codes, and required inspections will be scheduled

    Nsfaa permit description of workinstallation of a prefabricated container accessory structure in the rear yard of the property to be used as a bathroom facility.scope of work includes placement of one shipping container unit on an approved foundation system. interior improvements will include construction of a bathroom containing a toilet and shower. work will include installation of plumbing lines for water supply, sanitary sewer connection, and venting tied into the existing plumbing system.electrical work will include installation of lighting, receptacles, and an exhaust fan connected to the existing electrical service panel.work will include interior wall framing, insulation, moisture-resistant wall finishes, waterproof shower enclosure, and flooring appropriate for a bathroom environment.all work will comply with local building codes, plumbing codes, and electrical codes, and required inspections will be scheduled

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-26-000484
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Electrical remodel

    Electrical remodel

    City of Dallas permitElectrical (EL) Single Family Alteration$5K
    Record
    2001163058
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 719 S Montreal Ave

What is being built at 719 S Montreal Ave?

A City of Dallas permit indicates a prefabricated container accessory structure for use as a bathroom, with a toilet and shower. The permit was filed April 7, 2026, under RES-ALT-ADD-26-000484.

Is the project a new house at 719 S Montreal Ave?

The permit records describe a container accessory structure in the rear yard, not a new house. Its stated use is as a bathroom facility.

When was the bathroom structure permitted?

The alteration and addition permit was filed April 7, 2026. A residential electrical permit followed on June 18, and a residential plumbing permit was filed July 14, 2026.

What work does the permit at 719 S Montreal Ave include?

The April 7 permit describes placing a shipping container on an approved foundation and adding a toilet, shower, plumbing, lighting, receptacles and an exhaust fan. It also lists interior framing, insulation, moisture-resistant finishes and bathroom flooring.

What is the electrical permit for at 719 S Montreal Ave?

Permit RES-ELC-26-003602, filed June 18, 2026, covers an electrical inspection of the existing prefabricated container. The description mentions checking a 60-amp feeder to a subpanel and the existing electrical installation.

Are there plumbing permits for 719 S Montreal Ave?

Yes. The city record lists residential plumbing permit RES-PLM-26-007270, filed July 14, 2026, for plumbing work and a service inspection.

Also being built nearby

All of 75208
Get alerts for 719 S Montreal Ave