815 W Jefferson Blvd
Dallas, TX 75208
New gas line permits for a stove and water heater
Permits at 815 W Jefferson Blvd cover a new gas line for a stove and water heater. Dallas filed a commercial plumbing permit on July 8, 2026, and a residential plumbing permit on July 13, 2026.
Summarized from City of Dallas records · updated Jul 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 13, 2026
- since Jul 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 815 W Jefferson Blvd
What work is planned at 815 W Jefferson Blvd?
Dallas permit descriptions call for a new gas line for a stove and water heater. They do not describe other construction work.
When were permits filed for 815 W Jefferson Blvd?
The commercial plumbing permit was filed July 8, 2026, and the residential plumbing permit was filed July 13, 2026.
What are the permit numbers for 815 W Jefferson Blvd?
The permits are COM-PLM-26-002550, filed July 8, 2026, and RES-PLM-26-007216, filed July 13, 2026.
Are the permits for commercial or residential plumbing work?
Dallas records show both a commercial plumbing permit and a residential plumbing permit for gas line work at the address.
Is a new restaurant opening at 815 W Jefferson Blvd?
The permits describe a new gas line for a stove and water heater, but they do not identify a restaurant or other business.
Also being built nearby
All of 75208- 817 W Jefferson BlvdApr 6, 2026Mcr proposed work includes a full exterior repaint of the building. the color scheme will consist of two distinct colors: one primary color for the building elevations (walls) and a secondary contrasting color for all architectural trim · 3 m away
- 823 Centre StOct 10, 2025Re-wire/remodel home based on permit #res-alt-add-25-0008884 · 95 m away
- 837 Centre StDec 21, 2020Remove existing roof and install new roof · 100 m away
- 822 Sunset AveSep 22, 2020Electrical remodel · 101 m away
- 804 Sunset AveAug 12, 2025200 amp panel and meter base replacement · 101 m away
- 804 Centre StApr 21, 2026As part of the planned structural repairs, a total of 45 to 50 piers will be installed to support and stabilize the foundation. in addition, six beams measuring 4x6 will be replaced to ensure structural integrity. the project will also include the replacement of 15 joists, further reinforcing the overall framework · 108 m away
- 838 Centre StSep 2, 2025Install 22lf of 4' tall board on board style western red cedar fence.install 272lf of 8' tall board on board style western red cedar fence.includes (1) 8' tall x 10' wide steel frame cedar clad swing gate (manual)includes (1) 8' tall x 12' wide steel frame cedar clad slide gate (manual)includes (2) 8' tall x 5.5' wide steel frame cedar clad swing gates in double gate setupdouble gates have liftmaster la500 dual arm swing gate operator with battery backupinstall 152lf of 4' tall 3-rail smooth top picket bottom iron fencing.includes (1) 4' tall x 3' wide walk gateincludes (2) 4' tall x 4' wide gates in double gate setup · 113 m away
- 748 W Jefferson BlvdSep 25, 2020Electrical remodel · 116 m away
- 905 W Jefferson BlvdMay 29, 2026No work/ release · 155 m away
- 218 S Tyler StMay 13, 2026Extending existing 14" spiral duct to the back area. the back area consist of 3 restrooms and hallway. the existing 14" spiral duct will be reduce to 12" spiral duct and then to 4" and 6" flex r8 duct · 159 m away
- 216 S Tyler StDec 4, 2025Gas test with release · 160 m away
- 210 S Tyler StAug 6, 2026Remove built-up roofing system and replace with tpo roofing system · 164 m away