818 Brooks Ave
Dallas, TX 75208
818 Brooks Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 818 Brooks Ave, Dallas, TX 75208. The most recent, filed January 7, 2021, covers: “Gas relay or repair with test”.
Compiled from City of Dallas records · updated Jan 7, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 7, 2021
- since Jan 7, 2021
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 818 Brooks Ave
What is being built at 818 Brooks Ave?
The latest filing (City of Dallas permit 2101073083, January 7, 2021) covers gas relay or repair with test.
How many permits and filings does 818 Brooks Ave have?
1 filing across 1 project, from January 7, 2021 to January 7, 2021.
How much is the construction at 818 Brooks Ave worth?
Permits at this address list about $35 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 818 Brooks Ave?
Yes. Nearby filings include 817 Brooks Ave (4 ton hvac installation, Apr 20, 2026); 931 S Tyler St (expand driveway approach and driveway by 352 sq ft, May 28, 2026); 930 S Vernon Ave (gas test, Aug 21, 2026).
How do I get alerts for new permits at 818 Brooks Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 817 Brooks AveApr 20, 20264 ton hvac installation · 13 m away
- 931 S Tyler StMay 28, 2026Expand driveway approach and driveway by 352 sq ft · 75 m away
- 930 S Vernon AveAug 21, 2026Gas test · 112 m away
- 928 S Vernon AveNov 5, 2020Gas test · 113 m away
- 926 S Vernon AveJan 5, 2021Gas relay or repair with test · 115 m away
- 815 Delaware AveMay 5, 2025Building a carport · 117 m away
- 1103 S Tyler StOct 28, 2026Permit application for concrete support base under fence. requested by inspector · 120 m away
- 919 W Clarendon DrJul 31, 2026Replace 20 feet of sewer line, from cast iron to 4'' pvc to city tap. clean-outs will be replaced · 120 m away
- 1111 S Tyler StFeb 9, 2026New construction residential hvac installation. install (1) 3-ton heat pump system including outdoor condensing unit, indoor air handler, refrigerant line set, condensate drain, thermostat, and complete duct system (supply/return trunks, branch ducts, boots, grilles/registers). system to be installed per code and manufacturer specifications · 127 m away
- 1110 S Tyler StJun 5, 2026Gas line to pool heater · 161 m away
- 1007 S Van Buren AveJul 30, 2026Replace existing roof with new roof to include new shingles and underlayment · 191 m away
- 810 Nolte DrMay 19, 2026Replace 40 gallon gas water heater · 218 m away