903 N Montclair Ave
Dallas, TX 75208
903 N Montclair Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 903 N Montclair Ave, Dallas, TX 75208 since July 15, 2025. The most recent, filed July 22, 2025, covers: “12 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate”.
Compiled from City of Dallas records · updated Jul 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 22, 2025
- since Jul 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projects12 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate
12 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate
City of Dallas permitResidential Foundation Repair12 single press concrete piers with rebar reinforcement415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate
12 single press concrete piers with rebar reinforcement415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 903 N Montclair Ave
What is being built at 903 N Montclair Ave?
The latest filing (City of Dallas permit RES-FDN-25-000265, July 22, 2025) covers 12 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate.
How many permits and filings does 903 N Montclair Ave have?
2 filings across 2 projects, from July 15, 2025 to July 22, 2025.
Is there other construction near 903 N Montclair Ave?
Yes. Nearby filings include 1621 Kyle St (hvac replacement, Jul 18, 2025); 935 N Montclair Ave (mcr demolition existing retaining wall and replace with a stone and high strength mortar retaining wall per engineer plans and conservation approved plans / certificate, Nov 9, 2026); 1538 Kings Hwy (gas test, no repairs, Nov 3, 2025).
How do I get alerts for new permits at 903 N Montclair Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1621 Kyle StJul 18, 2025Hvac replacement · 19 m away
- 935 N Montclair AveNov 9, 2026Mcr demolition existing retaining wall and replace with a stone and high strength mortar retaining wall per engineer plans and conservation approved plans / certificate · 62 m away
- 1538 Kings HwyNov 3, 2025Gas test, no repairs · 89 m away
- 1518 Kings HwyJul 18, 20252 meter change outs - main house and guest house · 102 m away
- 1531 Kings HwyJan 21, 2026Replace section of sewer main under back porch · 103 m away
- 831 N Montclair AveJan 27, 2021Addition to sfd · 104 m away
- 1527 Kings HwyJul 16, 2025Electrical service repairs · 104 m away
- 829 N Montclair AveApr 20, 2026Replacing gate · 106 m away
- 806 N Montclair AveSep 30, 2026Remodel3 full bath, 1 kitchen, wash room · 117 m away
- 1611 Kings HwyJun 29, 2026Replace existing system with 3.5 ton lennox horizontal gas unit · 121 m away
- 914 Lausanne AveJun 17, 2026Re-roof of main structure · 127 m away
- 1631 Kings HwyNov 20, 2025Installation of 14.94kw roof-mounted pv system with 36 modules, 2 inverters & 2 batteries · 129 m away