911 W Jefferson Blvd
Dallas, TX 75208
Clay tile roof repair permitted at 911 W Jefferson Blvd
A commercial roofing permit filed March 16, 2026, describes roof work at 911 W Jefferson Blvd in Dallas. The work includes removing and resetting clay tiles, repairing damaged roof decking, and installing ice-and-water protection over about 1,200 square feet.
Summarized from City of Dallas records · updated Mar 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 16, 2026
- since Mar 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemove clay tiles, repair bad roof deck, install ice and water on decking after repaired, reset clay tiles, approx. 1200 sq ft
Remove clay tiles, repair bad roof deck, install ice and water on decking after repaired, reset clay tiles, approx. 1200 sq ft
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 911 W Jefferson Blvd
What work is permitted at 911 W Jefferson Blvd?
A City of Dallas commercial roofing permit describes removing clay tiles, repairing damaged roof decking, installing ice-and-water protection, and resetting the tiles.
When was the roof permit filed for 911 W Jefferson Blvd?
The permit was filed March 16, 2026. Its number is COM-ROOF-26-000064.
How much of the roof is included in the permit?
The permit description lists approximately 1,200 square feet of roofing work.
Is a new building being built at 911 W Jefferson Blvd?
The record describes roof repair work, not construction of a new building.
What kind of roof does 911 W Jefferson Blvd have?
The permit describes clay tiles being removed and reset after roof deck repairs.
Also being built nearby
All of 75208- 905 W Jefferson BlvdMay 29, 2026No work/ release · 10 m away
- 925 W Jefferson BlvdAug 5, 2025Electrical permit no work currently do not have electric · 22 m away
- 939 W Jefferson BlvdNov 17, 2026Electrical no work · 45 m away
- 218 S Tyler StMay 13, 2026Extending existing 14" spiral duct to the back area. the back area consist of 3 restrooms and hallway. the existing 14" spiral duct will be reduce to 12" spiral duct and then to 4" and 6" flex r8 duct · 87 m away
- 216 S Tyler StDec 4, 2025Gas test with release · 89 m away
- 210 S Tyler StAug 6, 2026Remove built-up roofing system and replace with tpo roofing system · 95 m away
- 915 Centre StDec 3, 2025Gas test · 95 m away
- 931 Centre StSep 28, 2020Gas relay or repair with test · 100 m away
- 926 Sunset AveJul 30, 2025Water heater installation · 103 m away
- 920 Centre StSep 14, 2020Gas relay or repair with test · 109 m away
- 909 Sunset AveNov 25, 2025Gas test · 113 m away
- 917 Sunset AveSep 11, 2026Zo bc office/live work · 113 m away