931 W 12th St
Dallas, TX 75208
Three-unit multifamily building permitted at 931 W 12th St
A new three-unit multifamily building is planned at 931 W 12th St in Dallas. The City of Dallas issued a new-construction permit on September 14, 2026, followed by electrical and plumbing permits later that month.
Summarized from City of Dallas records · updated Sep 26, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 26, 2026
- since Sep 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 931 W 12th St
What is being built at 931 W 12th St in Dallas?
City of Dallas permits describe a new multifamily building with three units. The new-construction permit is COM-NEW-26-000156.
How many units are planned at 931 W 12th St?
The permit records describe a multifamily project with three units.
When was the project at 931 W 12th St permitted?
The new-construction permit was filed September 14, 2026. Electrical and plumbing permits followed on September 22 and September 26, 2026.
Are electrical permits on file for 931 W 12th St?
Yes. Permit COM-ELC-26-004755, filed September 22, 2026, covers new electrical wiring, panels, meters and devices for three units.
Are plumbing permits on file for 931 W 12th St?
Yes. Permit COM-PLM-26-003813, filed September 26, 2026, covers plumbing for a new multifamily building of three units.
Has construction started at 931 W 12th St?
The records provided show new-construction, electrical and plumbing permits, but do not state whether construction has started.
Also being built nearby
All of 75208- 937 W 12th StApr 9, 2026We will provide the necessary manpower, equipment, water and sewer disconnects, as well as the demolition permit.the project involves the demolition of an approximately 1,600 square foot single-family home, which is situated on a concrete foundation that will also be removed. additionally, two structures located at the rear of the property, totaling approximately 800 square feet, will be removed including the concreteplease note that the removal is strictly confined to the property lines of the project site.we will also conduct rough grading of the demolition area.legal disposal of all debris materials will be carried out by transporting all waste to the designated dumpster for appropriate disposal at the landfill · 10 m away
- 912 W 12th St · Planet Fitness-12th StreetAug 6, 2025Add exposed ductwork · 37 m away
- 484 S Tyler StDec 14, 2020Install lawn sprinkler · 62 m away
- 920 Centre StSep 14, 2020Gas relay or repair with test · 97 m away
- 931 Centre StSep 28, 2020Gas relay or repair with test · 108 m away
- 915 Centre StDec 3, 2025Gas test · 112 m away
- 838 W 12th StSep 30, 2020Install roof mounted solar panels · 161 m away
- 834 W 12th StJan 8, 2021Gas relay or repair with test · 167 m away
- 832 W 12th StJan 8, 2021Gas relay or repair with test · 171 m away
- 615 Buckalew StDec 1, 2020Gas relay or repair with test · 171 m away
- 707 S Tyler StJun 24, 2025Replace 4 ton complete heat pump system · 178 m away
- 623 Buckalew StNov 19, 2020Gas relay or repair with test · 178 m away