4515 Kelton Dr
Dallas, TX 75209
Residential new construction permitted on Kelton Drive
City of Dallas records indicate residential new construction at 4515 Kelton Dr, with a permit filed May 11, 2026 (RES-NEW-26-000735). A house demolition permit was filed August 1, 2025, followed by plumbing, electrical and HVAC permits in 2026.
Summarized from City of Dallas records · updated Oct 16, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 16, 2026
- since Aug 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 4515 Kelton Dr
What is being built at 4515 Kelton Dr?
City records show a residential new construction permit for the address, filed May 11, 2026, under permit RES-NEW-26-000735.
Was a house demolished at 4515 Kelton Dr?
A City of Dallas demolition permit described the work as “Demolition house.” It was filed August 1, 2025, under permit RES-DEM-25-000311.
When were permits filed for construction at 4515 Kelton Dr?
The residential new construction permit was filed May 11, 2026. Plumbing and electrical permits followed in August, and an HVAC permit was filed October 16, 2026.
What do the permits say is planned for 4515 Kelton Dr?
The records list residential new construction, new plumbing, electrical work for new construction, and HVAC installation. They do not specify the home’s size or other design details.
What's being built near Toadally Purple Too on W Lovers Lane?
At 4515 Kelton Dr, about 156 meters from Toadally Purple Too, City of Dallas records show a residential new construction permit filed May 11, 2026.
Also being built nearby
All of 75209- 4522 Kelton DrDec 21, 2020Install water heater · 16 m away
- 4512 W Lovers LnAug 27, 2025Demolish building and pavement. haul off debris. no trees · 89 m away
- 4506 W Lovers LnAug 19, 2025Demolish house, haul off debris. no trees · 90 m away
- 4511 Newmore AveNov 30, 2020Replace sewer and gas piping · 95 m away
- 4507 Newmore AveApr 10, 2026Install hvac complete system with ductwork · 97 m away
- 4526 Newmore AveMay 13, 20263 ton base upflow gas system · 106 m away
- 4522 Newmore AveAug 8, 2025Lower sewer drain at yard and tunnel to reroute plumbing.main sewer was ran to the front of house, main sewer runs in alley · 106 m away
- 7696 Bristol AveDec 23, 2020Permanent electrical service · 115 m away
- 4503 W Lovers LnNov 10, 2026Demolition 420sf existing concrete, 158sf pergola, 36sf existing curb. pour new 534sf concrete, 240sf patio cover with electrical and privacy walls. new 9.75lf bar with sink and electrical, 9lf bar with electrical, 9lf bar with electrical, and 17 lf bar with electrical · 117 m away
- 4610 Kelton DrJun 29, 2026Nsfaa aluminum cantilever covers one attached to the house and the other freestanding cantilever off the house · 118 m away
- 4616 Kelton DrOct 27, 2026New plumbing · 125 m away
- 4448 W Lovers LnFeb 11, 2026New installation of 3/4" watts 009 backflow device for the irrigation planters.this will be installed on the wall of the side door entrance · 129 m away
More demolitions in 75209.