4909 Wren Way
Dallas, TX 75209
Fence and driveway gates to be replaced at 4909 Wren Way
A City of Dallas permit filed December 10, 2025, covers replacing about 76 linear feet of fence at 4909 Wren Way. The work includes a pedestrian gate and an automated sliding driveway gate, with galvanized steel posts and cedar pickets.
Summarized from City of Dallas records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemove and replace approx. 76 linear feet of fence, which includes one pedestrian gate and one automated sliding gate across the driveway. galvanized steel posts with cedar pickets
Remove and replace approx. 76 linear feet of fence, which includes one pedestrian gate and one automated sliding gate across the driveway. galvanized steel posts with cedar pickets
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 4909 Wren Way
What is being built at 4909 Wren Way?
A City of Dallas permit covers replacement of about 76 linear feet of fence, including a pedestrian gate and an automated sliding driveway gate. The filing is dated December 10, 2025, under permit RES-ACC-25-000905.
When was the fence permit filed at 4909 Wren Way?
The City of Dallas filed permit RES-ACC-25-000905 on December 10, 2025.
How much fence is being replaced at 4909 Wren Way?
The permit describes replacement of approximately 76 linear feet of fence.
What kind of gates are planned at 4909 Wren Way?
The permitted work includes one pedestrian gate and one automated sliding gate across the driveway.
What materials are listed for the fence at 4909 Wren Way?
The permit specifies galvanized steel posts and cedar pickets.
Also being built nearby
All of 75209- 6737 Kenwell StOct 7, 2026Install hvac · 38 m away
- 6723 Kenwell StSep 22, 20258 1/2' wood fence on steel posts · 43 m away
- 4923 Wren WayNov 6, 2026Nsfaa-construction of a new custom single-family residence, including foundation, framing, roofing, exterior finishes, interior build-out, plumbing, electrical, mechanical/hvac systems, and associated site improvements, in accordance with approved construction plans and applicable codes · 43 m away
- 6719 Kenwell StJul 3, 2025Gas test · 46 m away
- 6803 Kenwell StJul 15, 2026Install hvac · 62 m away
- 4922 Wenonah DrOct 7, 2026Tankless water heater replacement · 89 m away
- 4926 Wenonah DrSep 22, 2026New plumbing · 90 m away
- 4906 Wenonah DrJul 9, 2026Excavate/installation of swimming pool · 92 m away
- 5003 Wren WayNov 5, 2026Nsfaa rem/add second story addition and existing home change of layout · 94 m away
- 4902 Wenonah DrOct 7, 2025Install full hvac system with ductwork · 95 m away
- 4929 Wenonah DrSep 22, 2026Install hvac · 103 m away
- 6718 Starling CirSep 23, 20266718 starling inject 200lbs of polyurethane to stabilize foundation · 103 m away