5311 Edmondson Ave
Dallas, TX 75209
Sidewalk replacement permitted at 5311 Edmondson Ave
City of Dallas permits indicate that 75 feet of sidewalk at 5311 Edmondson Ave is being demolished and replaced with concrete. The residential sidewalk permits were filed March 6 and April 27, 2026.
Summarized from City of Dallas records · updated Apr 27, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 27, 2026
- since Mar 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsConcrete flat work full length of side walk (pour back) 75ft x 4 ft@ 4in thick (demolition and haul off included) - concrete - sand - lumber - labor - finish
Concrete flat work full length of side walk (pour back) 75ft x 4 ft@ 4in thick (demolition and haul off included) - concrete - sand - lumber - labor - finish
City of Dallas permitResidential Drive Approach and Sidewalk PermitConcrete flat work full length of side walk (pour back)75ft x 4 ft@ 4in thick(demolition and haul off included)- concrete- sand- lumber - labor- finish
Concrete flat work full length of side walk (pour back)75ft x 4 ft@ 4in thick(demolition and haul off included)- concrete- sand- lumber - labor- finish
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 5311 Edmondson Ave
What is being built at 5311 Edmondson Ave?
City of Dallas permits describe demolition and replacement of a 75-foot section of sidewalk with concrete. They do not indicate a new building project.
Is the sidewalk at 5311 Edmondson Ave being replaced?
The permit descriptions indicate that the sidewalk is being demolished and repoured. The work is listed as 75 feet long and 4 feet wide.
When were permits filed for sidewalk work at 5311 Edmondson Ave?
The City of Dallas filed residential drive approach and sidewalk permits on March 6 and April 27, 2026.
What are the permit numbers for 5311 Edmondson Ave?
The sidewalk permits are RES-DSW-26-000109, filed March 6, 2026, and RES-DSW-26-000212, filed April 27, 2026.
Is a new building planned at 5311 Edmondson Ave?
The records provided list sidewalk work, including demolition and concrete replacement, and do not list a new building project.
Also being built nearby
All of 75209- 5218 Edmondson AveFeb 19, 2026Gas test & repair · 39 m away
- 5210 Edmondson AveApr 27, 202650 gallon gas water heater in laundry room closet · 47 m away
- 5343 Edmondson AveAug 3, 2026Installing 5 ton for the main · 57 m away
- 5310 Edmondson AveJan 6, 2021Install new hvac · 59 m away
- 5338 Edmondson AveNov 9, 2026Install a permanent 26kw & (1) 200amp transfer switch · 88 m away
- 5330 Livingston AveAug 7, 20255 ton system replacement · 98 m away
- 5304 Livingston AveJul 24, 20265 ton complete · 99 m away
- 3939 Fairfax AveAug 27, 2026Install 40 gallon gas water heater in attic (swap out) · 116 m away
- 3946 Fairfax AveNov 19, 2020Install water heater · 119 m away
- 3931 Fairfax AveDec 11, 2020Install open pergola with outdoor kitchen · 125 m away
- 3925 Fairfax AveNov 25, 2020Install water heater · 134 m away
- 3918 Fairfax AveNov 6, 2025Tear off existing flat roof section and replace with new tpo and related components · 150 m away
More demolitions in 75209.