5505 W University Blvd
Dallas, TX 75209
Residential plumbing work at 5505 W University Blvd
No new building is listed at 5505 W University Blvd; Dallas permits show residential plumbing work at the home. A permit filed December 30, 2025, covers replacing the sewer line beneath the home, and a February 16, 2026, permit describes moving a plumbing location from the exterior to the interior.
Summarized from City of Dallas records · updated Feb 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 16, 2026
- since Dec 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5505 W University Blvd
What is being built at 5505 W University Blvd?
The records do not list a new building. They show residential plumbing permits for sewer-line replacement and moving a plumbing location from the exterior to the interior.
What work was permitted at 5505 W University Blvd?
A December 30, 2025, permit covers replacing the sewer line under the home with a new PVC line. A February 16, 2026, permit describes moving a location from outside the home to inside.
When was the sewer line work permitted at 5505 W University Blvd?
The City of Dallas filed residential plumbing permit RES-PLM-25-009339 on December 30, 2025. Its description says the sewer line under the home will be replaced with a new PVC line.
What does permit RES-PLM-26-001798 cover?
The City of Dallas filed this residential plumbing permit on February 16, 2026. Its description says a location was moved from the exterior of the home to the interior.
Are there permits for a new home at 5505 W University Blvd?
The records provided list two residential plumbing permits, not a permit for new home construction. The permits were filed on December 30, 2025, and February 16, 2026.
Also being built nearby
All of 75209- 5509 W University BlvdMar 10, 2026Replacing 2 ton hvac system. condenser, furnace, evaporator coil · 9 m away
- 5514 W University BlvdApr 2, 2026Outdoor shut off valve replacement · 25 m away
- 5526 W University BlvdApr 9, 2026Replace the circle gravel driveway with a standard concrete driveway. no approach to the curb. no right of way needed. just the driveway. the approach from the street is already concrete · 49 m away
- 5532 W University BlvdMar 20, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment.erie to furnish and install decking with osb where applicable · 62 m away
- 5537 W University BlvdJan 15, 2021Install fence · 69 m away
- 5514 Emerson AveNov 11, 2020Foundation repair · 106 m away
- 5509 Emerson AveJul 23, 2026Remove old composition shingles & install new composition shingles · 116 m away
- 5505 Wateka DrMay 29, 202650 gallon gas install in 2nd floor pull down attic · 147 m away
- 5551 Emerson AveFeb 16, 2026Hvac change out · 155 m away
- 5531 Wateka DrJul 2, 2026Nsfaa replace front door with a new steel door with sidelights, square off opening and add a small standing seam roof over new door · 156 m away
- 5438 W University BlvdJun 2, 2025Gas test · 159 m away
- 5522 Wateka DrOct 6, 2020Gas relay or repair with test · 164 m away