groundranger
Recent · latest filing May 2026Residential

5511 Greenbrier Dr

Dallas, TX 75209

5511 Greenbrier Dr bathroom remodel and new roof

Permits indicate an existing Jack-and-Jill bathroom at 5511 Greenbrier Dr is being converted into two separate bathrooms. The alteration permit was filed August 5, 2025, followed by plumbing, electrical and mechanical permits for the remodel. A separate roofing permit filed May 22, 2026, covers replacing the roof with black shingles.

Summarized from City of Dallas records · updated May 22, 2026

Projects
5
5 filings
Latest filing
May 22, 2026
since Aug 5, 2025
Largest scope
—
Listed value
—

Permit & project history

5 projects
  1. Removing roof down to the decking, adding approved felt and shingles.new roof color will be black

    Removing roof down to the decking, adding approved felt and shingles.new roof color will be black

    City of Dallas permitResidential Roofing Permit
    Record
    RES-ROOF-26-000808
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Bathroom is being remodeled and we will run new flex duct to the bathroom

    Bathroom is being remodeled and we will run new flex duct to the bathroom

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-002347
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Bathroom remodel

    Bathroom remodel

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-002747
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Misc. plumbing for bathroom remodel

    Misc. plumbing for bathroom remodel

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-004101
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Nsfaa-scope of work – jack & jill bathroom conversion and remodelproject overview:this project involves the complete demolition and remodel of an existing ~10’ x 10’ jack & jill bathroom. the current shared layout will be reconfigured to create two separate bathrooms, one for each child, through the construction of a new partition wall. the remodel will include new plumbing, electrical, hvac reallocation, updated finishes, and fixture installation throughout.demolition & preparationfull removal of existing fixtures, including the bathtub, vanity, toilet, wall/floor tile, and associated plumbing trim.demolition of existing wall finishes as needed to accommodate new layout and mep systems.removal of flooring and proper substrate preparation for new tile installation.framing & separation wallconstruct a new separation wall to divide the existing bathroom space into two independent bathrooms.the separation wall will include a 12” cavity to house in-wall plumbing and allow for installation of wall-hung (floating) toilets on each side.plumbingrelocate and rough-in plumbing for two new walk-in showers, two wall-hung toilets (one on each side of separation wall), and two vanities with sinks.all plumbing to be housed within the 12” cavity wall where required.final connection and installation of new plumbing fixtures.plumber will pull necessary permits for all plumbing work.hvacexisting single supply vent will be split into two new branches to serve each of the newly divided bathrooms.install new ductwork and diffusers to ensure each bathroom has independent airflow and ventilation.electricaladd four (4) new recessed can lights, with one located inside each shower enclosure (to be wet-rated fixtures).install two exhaust fans, one for each bathroom.reconfigure switches to include:a shared switch leg for the shower light and exhaust fan.a separate switch for the remaining three can lights in each bathroom, fitted with dimmer controls.verify gfci protection where applicable.tile & finishesinstall new floor tile throughout both bathrooms.tile installation in shower enclosures only, including waterproofing behind tiled areas.install new glass shower doors for both walk-in showers.install two new vanities with sinks.install two floating toilets mounted to the new separation wall.walls, paint & final finishinstall and finish new drywall where necessary, including patched areas from demolition or plumbing/electrical work.prime and paint all new wall and ceiling surfaces with mildew-resistant paint suitable for bathroom environments.perform final fixture setting, trim installation, and cleaning for client-ready handover

    Nsfaa-scope of work – jack & jill bathroom conversion and remodelproject overview:this project involves the complete demolition and remodel of an existing ~10’ x 10’ jack & jill bathroom. the current shared layout will be reconfigured to create two separate bathrooms, one for each child, through the construction of a new partition wall. the remodel will include new plumbing, electrical, hvac reallocation, updated finishes, and fixture installation throughout.demolition & preparationfull removal of existing fixtures, including the bathtub, vanity, toilet, wall/floor tile, and associated plumbing trim.demolition of existing wall finishes as needed to accommodate new layout and mep systems.removal of flooring and proper substrate preparation for new tile installation.framing & separation wallconstruct a new separation wall to divide the existing bathroom space into two independent bathrooms.the separation wall will include a 12” cavity to house in-wall plumbing and allow for installation of wall-hung (floating) toilets on each side.plumbingrelocate and rough-in plumbing for two new walk-in showers, two wall-hung toilets (one on each side of separation wall), and two vanities with sinks.all plumbing to be housed within the 12” cavity wall where required.final connection and installation of new plumbing fixtures.plumber will pull necessary permits for all plumbing work.hvacexisting single supply vent will be split into two new branches to serve each of the newly divided bathrooms.install new ductwork and diffusers to ensure each bathroom has independent airflow and ventilation.electricaladd four (4) new recessed can lights, with one located inside each shower enclosure (to be wet-rated fixtures).install two exhaust fans, one for each bathroom.reconfigure switches to include:a shared switch leg for the shower light and exhaust fan.a separate switch for the remaining three can lights in each bathroom, fitted with dimmer controls.verify gfci protection where applicable.tile & finishesinstall new floor tile throughout both bathrooms.tile installation in shower enclosures only, including waterproofing behind tiled areas.install new glass shower doors for both walk-in showers.install two new vanities with sinks.install two floating toilets mounted to the new separation wall.walls, paint & final finishinstall and finish new drywall where necessary, including patched areas from demolition or plumbing/electrical work.prime and paint all new wall and ceiling surfaces with mildew-resistant paint suitable for bathroom environments.perform final fixture setting, trim installation, and cleaning for client-ready handover

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-25-000547
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 5511 Greenbrier Dr

What is being built at 5511 Greenbrier Dr?

Permits describe remodeling a shared Jack-and-Jill bathroom into two separate bathrooms, with new showers, toilets and vanities. The records also include a roof replacement permit.

Is 5511 Greenbrier Dr getting a new bathroom?

The August 5, 2025, alteration permit describes dividing an existing bathroom into two. Plumbing, electrical and mechanical permits for the remodel followed in August and September 2025.

What work is included in the bathroom remodel at 5511 Greenbrier Dr?

The permit describes a new partition wall, two walk-in showers, two toilets and two vanities, along with updated plumbing, electrical and ventilation. The alteration permit is RES-ALT-ADD-25-000547.

Is the roof being replaced at 5511 Greenbrier Dr?

Yes. Permit RES-ROOF-26-000808, filed May 22, 2026, describes removing the existing roof down to the decking and installing felt and black shingles.

When were permits filed for work at 5511 Greenbrier Dr?

The bathroom alteration permit was filed August 5, 2025. Related plumbing, electrical and mechanical permits were filed August 25 and September 3, 2025; the roof permit was filed May 22, 2026.

Also being built nearby

All of 75209

More demolitions in 75209.

Get alerts for 5511 Greenbrier Dr