5635 Stonegate Rd
Dallas, TX 75209
5635 Stonegate Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 5635 Stonegate Rd, Dallas, TX 75209. The most recent, filed August 13, 2025, covers: “Replace gas line in the yard”.
Compiled from City of Dallas records · updated Aug 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2025
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5635 Stonegate Rd
What is being built at 5635 Stonegate Rd?
The latest filing (City of Dallas permit RES-PLM-25-003650, August 13, 2025) covers replace gas line in the yard.
How many permits and filings does 5635 Stonegate Rd have?
1 filing across 1 project, from August 13, 2025 to August 13, 2025.
Is there other construction near 5635 Stonegate Rd?
Yes. Nearby filings include 5638 Stonegate Rd (install 75' of 8' tall cedar fence, Mar 19, 2026); 5626 Stonegate Rd (1. downstairs laundry room (relocation)* cap off and remove the existing washer box, including associated drain and water supply lines.* saw-cut and break concrete slab as required.* excavate to necessary depth to install new plumbing lines.* install new water supply lines and drain lines to accommodate relocated washer box.* stub-out plumbing at new location for final connection after framing is completed.?2. new downstairs restroom installation* install new water supply lines and drain lines for: * toilet * sink (lavatory) * stand-up shower* install appropriate hangers and supports for all drain lines beneath the structure.* ensure proper slope (fall) for all drainage piping in accordance with plumbing code.?3. upstairs laundry room installation* install new water supply lines and drain lines for: * washer box * laundry sink* ensure all plumbing installations comply with current building and plumbing codes.* install vent stack and extend through roof for proper ventilation.?4. dryer vent installation* install single-wall metal dryer exhaust vent piping up to 25 feet in length.* route vent to exterior termination point per code requirements.?5. materials & utilities* water supply lines to be installed using: * 1/2” copper piping * 3/4” copper piping (alternative materials available upon customer request and approval.)* dryer appliances to be supplied with gas connections.?6. general notes* all work shall comply with applicable city of dallas codes and regulations.* contractor to coordinate with framing and other trades as necessary.* final connections and fixture installations to occur after framing and inspections, as applicable, May 18, 2026); 5645 Stonegate Rd (install solar panels, Jan 28, 2021).
How do I get alerts for new permits at 5635 Stonegate Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 5638 Stonegate RdMar 19, 2026Install 75' of 8' tall cedar fence · 15 m away
- 5626 Stonegate RdMay 18, 20261. downstairs laundry room (relocation)* cap off and remove the existing washer box, including associated drain and water supply lines.* saw-cut and break concrete slab as required.* excavate to necessary depth to install new plumbing lines.* install new water supply lines and drain lines to accommodate relocated washer box.* stub-out plumbing at new location for final connection after framing is completed.?2. new downstairs restroom installation* install new water supply lines and drain lines for: * toilet * sink (lavatory) * stand-up shower* install appropriate hangers and supports for all drain lines beneath the structure.* ensure proper slope (fall) for all drainage piping in accordance with plumbing code.?3. upstairs laundry room installation* install new water supply lines and drain lines for: * washer box * laundry sink* ensure all plumbing installations comply with current building and plumbing codes.* install vent stack and extend through roof for proper ventilation.?4. dryer vent installation* install single-wall metal dryer exhaust vent piping up to 25 feet in length.* route vent to exterior termination point per code requirements.?5. materials & utilities* water supply lines to be installed using: * 1/2” copper piping * 3/4” copper piping (alternative materials available upon customer request and approval.)* dryer appliances to be supplied with gas connections.?6. general notes* all work shall comply with applicable city of dallas codes and regulations.* contractor to coordinate with framing and other trades as necessary.* final connections and fixture installations to occur after framing and inspections, as applicable · 19 m away
- 5645 Stonegate RdJan 28, 2021Install solar panels · 93 m away
- 5645 Caruth BlvdDec 9, 2025Remove old shingles, remove old felt, install new felt, install new shingles · 105 m away
- 5627 Caruth BlvdMay 18, 2026Install 28kw generator, and 2/200 amp transfer switches · 105 m away
- 5644 Caruth BlvdApr 2, 2026Demolition old and install new driveway approach 12'x13'supply and install concrete for 6" flatwork with #4 re-bar 16" on center, 4000 psi · 118 m away
- 5610 Farquhar LnNov 20, 2025Run gas from meter to furnace mechanical closet. trench 45ft. 1 inch poly gas line · 118 m away
- 5608 Farquhar LnNov 18, 2025(1) 2 ton trane xr17 complete system change-out. does not include ductwork · 119 m away
- 5603 Caruth BlvdDec 2, 2020Demolition sfd · 119 m away
- 5700 Stonegate RdSep 17, 2026Ac replacement4 ton lennox gold package complete systemoutdoor unit el18kcv variable speed variable speed 90% high efficiency furnace · 124 m away
- 5545 Stonegate RdJul 7, 2026Install gas line to pool heater · 156 m away
- 5535 Stonegate RdAug 6, 2025Gas meter relocate · 174 m away