5845 Farquhar Ln
Dallas, TX 75209
5845 Farquhar Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 5845 Farquhar Ln, Dallas, TX 75209. The most recent, filed July 13, 2025, covers: “Remove existing roofing system install new iso board, and tpo”.
Compiled from City of Dallas records · updated Jul 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 13, 2025
- since Jul 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5845 Farquhar Ln
What is being built at 5845 Farquhar Ln?
The latest filing (City of Dallas permit RES-ROOF-25-000467, July 13, 2025) covers remove existing roofing system install new iso board, and tpo.
How many permits and filings does 5845 Farquhar Ln have?
1 filing across 1 project, from July 13, 2025 to July 13, 2025.
Is there other construction near 5845 Farquhar Ln?
Yes. Nearby filings include 5855 Farquhar Ln (solar rooftop, backup battery, and mpu/mpr, Sep 5, 2025); 5866 Farquhar Ln (complete service upgrade new meter base, disconnect and panels, Feb 4, 2026); 5865 Farquhar Ln (gas test, Dec 3, 2025).
How do I get alerts for new permits at 5845 Farquhar Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 5855 Farquhar LnSep 5, 2025Solar rooftop, backup battery, and mpu/mpr · 10 m away
- 5866 Farquhar LnFeb 4, 2026Complete service upgrade new meter base, disconnect and panels · 16 m away
- 5865 Farquhar LnDec 3, 2025Gas test · 19 m away
- 5835 Farquhar LnDec 17, 2025Removing existing shingles and replacing with new shingles. also removing existing flat roof material and replacing with tpo · 30 m away
- 8858 Mccraw DrJun 24, 2025Change out an overheating panel, install surge protection, and arc fault breakers · 51 m away
- 5802 Redwood CtMay 23, 2025Install 50 gal gas heater · 68 m away
- 5811 Redwood CtJul 8, 2026Installed one 50 gallon gas water heater · 80 m away
- 5805 Farquhar LnJun 30, 2026Installing 5 piers, sump pump, discharge line · 90 m away
- 5765 Stonegate RdAug 31, 2026Cast iron replacement · 196 m away
- 5722 Farquhar LnJul 30, 2026Adding 900 sq ft extending and adding branch circuits · 206 m away
- 5721 Farquhar LnNov 4, 2020Install fence · 208 m away
- 5710 Farquhar LnNov 17, 2020Install fence · 223 m away