6531 Prosper St
Dallas, TX 75209
HVAC and water-line work permitted at 6531 Prosper St
City of Dallas permits indicate residential repair work at 6531 Prosper St, not a new building project. A water-line replacement permit was filed April 17, 2026, followed by a furnace and condenser replacement permit on August 14, 2026.
Summarized from City of Dallas records · updated Aug 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 14, 2026
- since Apr 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6531 Prosper St
What is happening at 6531 Prosper St in Dallas?
City of Dallas records show a 35-foot water-line replacement and a furnace and condenser changeout. The permits were filed April 17 and August 14, 2026.
Is a new home being built at 6531 Prosper St?
The listed permits are for residential plumbing and mechanical work, not new construction. The records describe a water-line replacement and HVAC equipment changeout.
What HVAC work was permitted at 6531 Prosper St?
Permit RES-MEC-26-004448, filed August 14, 2026, describes a 3-ton condenser and 75,000-BTU furnace changeout.
Was a water line replaced at 6531 Prosper St?
A City of Dallas residential plumbing permit filed April 17, 2026, describes replacement of 35 feet of water line. The permit number is RES-PLM-26-004089.
When were permits filed for 6531 Prosper St?
The plumbing permit was filed April 17, 2026, and the mechanical permit was filed August 14, 2026.
Also being built nearby
All of 75209- 6526 Prosper StAug 18, 2025Gas line test · 16 m away
- 6541 Prosper StSep 26, 2025Gas pressure test for atmos gas release · 22 m away
- 6520 Prosper StDec 21, 2025Panel upgrade · 25 m away
- 6545 Prosper StApr 8, 2026Nsfaa-residential new construction · 31 m away
- 6511 Prosper StApr 13, 2026Replacing the gas water heater in the 1st floor closet · 39 m away
- 6555 Prosper StMar 30, 2026Nsfaa-residential new construction · 53 m away
- 6504 Prosper StAug 21, 2026Partial gas repipe.eliminated gas most of existing gas piping under home. kitchen gas line will remain as is. running new gas line to furnace in attic · 57 m away
- 4802 W Mockingbird LnSep 19, 2025Gas test · 77 m away
- 4701 W Mockingbird LnSep 15, 2020Electrical repairs · 88 m away
- 6551 Kenwell StDec 12, 2020Gas relay or repair with test · 103 m away
- 6513 Lockheed AveSep 23, 2025Nsfaa-new single family · 104 m away
- 6517 Lockheed AveOct 13, 2025Service update · 108 m away