7515 Lemmon Ave., Terminal J
Dallas, TX 75209 · Terminal J
14,000-square-foot private aircraft terminal planned at Dallas NetJets campus
A new 14,000-square-foot private aircraft terminal, Terminal J, is planned at 7515 Lemmon Ave. A Texas Department of Licensing and Regulation project registration dated July 31, 2026, places it in phase 2 of a three-phase project, which also includes redesigned sitework and parking. The applicant estimates the project cost at $35 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 31, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2026
- since Jul 31, 2026
- Largest scope
- 14,000 sf
- Estimated cost
- $35M
- state registration
Where this project stands
Under constructionDallas NetJets Campus - Terminal & Site
14,000 sq ft · $35M est.
- RegisteredJul 31, 2026
- Plan review
- ConstructionNov '26 – May '28
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectTerminal j will be a newly constructed 14,000 sq-ft private aircraft terminal. the terminal will be constructed within phase 2 of a three-phase project. also, phase 2 will included renovated sitework that redesigns the surrounding areas and parking — terminal j
TDLR project registrationNew ConstructionReview Complete14,000 sq ft$35M est.- Project #
- TABS2026026662
- Tenant / owner
- Dallas Netjets Campus - Terminal & Site
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7515 Lemmon Ave., Terminal J
What is being built at 7515 Lemmon Ave. in Dallas?
A new 14,000-square-foot private aircraft terminal called Terminal J is planned at the Dallas NetJets campus. The TDLR registration is project number TABS2026026662.
How large will Terminal J be?
The TDLR registration describes a 14,000-square-foot terminal.
When was the Terminal J project filed?
The project was registered with TDLR on July 31, 2026. Its registration number is TABS2026026662.
What is included in phase 2 of the Dallas NetJets campus project?
Phase 2 includes construction of Terminal J and redesigned sitework and parking around it. The filing describes the overall campus project as having three phases.
How much is the Terminal J project estimated to cost?
The applicant's estimated cost for the project is $35 million, according to the TDLR registration dated July 31, 2026.
What's being built near Dallas NetJets Campus at Hangar E?
A separate TDLR filing dated August 12, 2026, describes a new 80,000-square-foot aircraft hangar with 18,000 square feet of shops and office space at 7515 Lemmon Avenue, Hangar E.
Also being built nearby
All of 75209- 7515 Lemmon AveNov 16, 2026Replacing parking and storage area with proposed fuel storage and fueling area at dal airport for signature aviation. the only building is a prefab metal enclosure (10'x10') housing the system controls. there is a double tank fueling facility and a double truck fueling facility. this project includes the systems to accept and distribute jet-a fuel for aircraft refueling. the tank farm is designed for six 100,000-gal tanks, with three being installed for this project
- 7515 Lemmon Avenue, Hangar E · Signature Flight Support LLCAug 12, 2026Dallas netjets campus - terminal & site — new construction — new construction of an 80,000 sq ft aircraft hangar pre-engineered metal building with an associated 18,000 sq ft of shops & office space
- 7555 Lemmon AveMay 12, 2026Electrical install for backup generator · 39 m away
- 4315 Hopkins AveNov 19, 2026I am building a pavilion in the courtyard · 82 m away
- 7636 Culcourt StNov 12, 2026Gas test · 141 m away
- 3930 Bluffview BlvdOct 30, 2025Build a new side yard return fence to connect existing fence to the house. the fence is 8', horizontal slat, rough cedar with a pedestrian gate on both sides · 142 m away
- 3921 Bluffview BlvdDec 21, 2020Electric service for traffic signals · 146 m away
- 7648 Culcourt StNov 26, 2025Solar rooftop, backup battery, and mpu/mpr · 159 m away
- 7701 Lemmon AveDec 11, 2020Renovation · 180 m away
- 4407 Hopkins AveOct 19, 2026Demolish single family homes approx. 1600 sq ft that was partially demolish. removing all existing slab. remove all existing driveway. remove 4 trees including excavation root balls & removing shrubs & vegetation around the house · 221 m away
- 4419 Hopkins AveSep 23, 2026Wire swimming pool · 246 m away
- 7777 Lemmon Ave · The Braniff Centre, LPJan 16, 2024Flex jet - breakroom expansion — renovation/alteration — renovate 5645 sq ft of existing space - adding men and women locker rooms, men and women restrooms, a break room, offices and a conference room · 253 m away