9027 Midway Rd
Dallas, TX 75209 · Cochran Chapel United Methodist Church
Cox Chapel interior renovation at Cochran Chapel UMC
A 2,127-square-foot partial interior renovation of Cox Chapel at Cochran Chapel United Methodist Church was registered with TDLR on January 29, 2024. The scope includes accessible restroom renovations and updates to interior finishes and lighting.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 29, 2024
- since Jan 29, 2024
- Largest scope
- 2,127 sf
- Estimated cost
- $120K
- state registration
Where this project stands
CompletedCox Chapel Renovation
2,127 sq ft · $120K est.
- RegisteredJan 29, 2024
- Plan review
- ConstructionFeb '24 – Jun '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project is for a partial interior renovation of cox chapel (2127 sq ft) in cochran chapel umc campus at dallas, tx. the project scope includes renovation of the restrooms to provide tas accessible restrooms and some interior finish & lighting up — cox chapel
TDLR project registrationRenovation/AlterationProject Closed2,127 sq ft$120K est.- Project #
- TABS2024010356
- Tenant / owner
- Cox Chapel Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9027 Midway Rd
What is being renovated at 9027 Midway Road?
A TDLR registration describes a partial interior renovation of Cox Chapel on the Cochran Chapel United Methodist Church campus. The project covers 2,127 square feet.
What updates are planned for Cox Chapel?
The registered scope includes restroom renovations to provide TAS-accessible restrooms, along with updates to interior finishes and lighting.
When was the Cox Chapel renovation registered?
The project was registered with TDLR on January 29, 2024. The registration number is TABS2024010356.
How much will the Cox Chapel renovation cost?
The TDLR registration lists an estimated project cost of $120,000. This is the applicant's estimate for the project.
Is this new construction at 9027 Midway Road?
No new construction is listed in this record. The project is described as a partial interior renovation of Cox Chapel.
Is the Cox Chapel renovation complete?
The TDLR project record lists its status as Project Closed.
Also being built nearby
All of 75209- 9027 Midway Road · Micah BuildingJun 4, 2026Creative school at cochran chapel — renovation/alteration — 3,301 s.f. existing building renovation 3608 sq ft addition to building
- 9027 Midway RdSep 1, 2026Add new bathrooms andrelocate existing ones
- 4304 Cochran Chapel CirJan 7, 2026Replacement of the gas furnace with one 90k btu two-stage lennox sl280vk · 24 m away
- 4306 Cochran Chapel CirFeb 11, 2026Replace roof shingles · 25 m away
- 4310 Cochran Chapel CirAug 7, 2026Replacement of 2.5-ton evaporator coil · 29 m away
- 4314 Cochran Chapel CirMar 9, 2026Replacing the two gas water heaters with similar models · 39 m away
- 4335 Cochran Chapel CirApr 1, 2026. remove the existing roof.2. replace rotten decking as needed - up to 2 (4x8) sheets included.3. install ice and water shields in valleys, around penetrations, and on all slopes below 3/12.4. install synthetic underlayment to all slopes 3/12 and over.5. remove and replace drip edges from eaves and rakes.6. install starter shingles to eaves and rakes to manufacturer's specifications.7. replace jacks and boots as needed.8. paint jacks and vents to match the roof.9. counter flash chimney and/or wall abutments as needed.10. install valley shingles using half-cut method.11. install shingles using 6 nails per shingle and to the manufacturer's specifications.12. remove all debris and trash from worksite upon completion of the project, including a sweep of the area with a magnet.13. this price includes materials, labor, and equipment needed to complete the project · 60 m away
- 4370 Cochran Chapel CirMar 31, 2026Replacing 3 ton 17seer heat pump system · 94 m away
- 4343 W Northwest HwyNov 13, 2020Install new roof over existing roof · 108 m away
- 4346 Cochran Chapel CirOct 21, 2025Reconnect gas service · 109 m away
- 4347 W Northwest HwyJul 18, 2026Relocate outlets and lighting for new tenant · 110 m away
- 4349 W Northwest HwyFeb 11, 2026Replace rpz in food prep area · 111 m away