3308 Birmingham Ave
Dallas, TX 75210
Fence installation permitted at 3308 Birmingham Ave
A commercial permit indicates installation of a privacy and security fence at 3308 Birmingham Ave in Dallas. The City of Dallas issued the permit on August 19, 2025, for 122 feet of 8-foot cedar picket fencing and 135 feet of 6-foot wrought-iron fencing.
Summarized from City of Dallas records · updated Aug 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 19, 2025
- since Aug 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall 8' fence for privacy and security for property. (122 feet of 8' cedar picket) (135 feet of 6' wrought iron)
Install 8' fence for privacy and security for property. (122 feet of 8' cedar picket) (135 feet of 6' wrought iron)
City of Dallas permitCommercial Accessory Structure Permit
Sources: City of Dallas
Questions about 3308 Birmingham Ave
What is being built at 3308 Birmingham Ave in Dallas?
A City of Dallas permit indicates installation of a privacy and security fence: 122 feet of 8-foot cedar picket fencing and 135 feet of 6-foot wrought-iron fencing.
When was the fence permit filed for 3308 Birmingham Ave?
The permit was filed on August 19, 2025. Its number is COM-ACC-25-000102.
How tall is the fence planned for 3308 Birmingham Ave?
The permit describes 122 feet of 8-foot cedar picket fence and 135 feet of 6-foot wrought-iron fence.
Is a new building being built at 3308 Birmingham Ave?
The available City of Dallas record is for a commercial accessory structure permit to install fencing. It does not describe a new building.
What is being built near the Log Flume Area Redevelopment Plan in Dallas?
At 3308 Birmingham Ave, about 296 meters from the Log Flume Area Redevelopment Plan site, a City of Dallas permit indicates installation of cedar picket and wrought-iron fencing. The permit was filed August 19, 2025.
Also being built nearby
All of 75210- 1815 Jb Jackson Jr BlvdSep 25, 20261-8 consolidated dwelling 1-8 unit ** to be reviewed by com-zo & res-bu · 22 m away
- 3235 Dallas StMay 18, 2025Wasterwater plumbing connection to city wastewater main in the alley adjacent to property · 121 m away
- 1730 Jb Jackson Jr BlvdSep 5, 2025Added additional grounding and surge protector to panel.“ · 125 m away
- 1920 Jb Jackson Jr BlvdJul 31, 2026New water meter · 127 m away
- 1715 Robert B. Cullum Blvd · Rocket PhillyOct 22, 2024Rocket philly restaurant — new construction — 5600sqft restaurant · 152 m away
- 3227 Pennsylvania AveJul 28, 2026Demolition existing structure \| 3227 pennsylvania · 195 m away
- 3223 Pennsylvania AveNov 10, 2026Bc el fire the scope of work consists of reusing the existing 11'-0" x 16'-0" concrete pad and extending it to 11'-0" x 22'-0". improvements include the installation of one 12'-0" h-frame, two span panels, four tesla powerwall 3 units, two tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200a meter in the existing meter box, one new meter box with a 200a meter, four nodes, and one ground bar. the project also includes installing conduit runs from the h-frame to the nodes and fiber handholes, with the final quantity of handholes to be determined by the contractor · 197 m away
- 1997 Robert B Cullum BlvdOct 20, 2020Electric service for traffic signals · 203 m away
- 3203 Pennsylvania Ave · Simple Faith InternationalMar 12, 2025Simple faith international — new construction — new construction of metal pre fabricated church building and parking lot · 208 m away
- 3203 Pennsylvania AveApr 1, 2026“installation of plumbing systems for a new commercial building, including domestic water distribution and sanitary wastewater piping throughout the structure. work includes connection to approved water and wastewater services per city of dallas standards and approved plans · 208 m away
- 3130 Lenway StFeb 17, 2026Roof replacement- 30 year class 4 shingles. 27 squares · 218 m away
- 2023 Jb Jackson Jr BlvdNov 13, 2025Service release no work per oncor · 236 m away