3623 Reed Ln
Dallas, TX 75210
Residential construction permitted at 3623 Reed Ln
A residential new-construction project was permitted at 3623 Reed Ln on March 23, 2026. The permit lists 1,456 square feet of air-conditioned space and a 48-square-foot porch, for 1,504 square feet total.
Summarized from City of Dallas records · updated Mar 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 23, 2026
- since Mar 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNsfaa residential new constructiona/c square footage1456porch square footage48total square footage 1504
Nsfaa residential new constructiona/c square footage1456porch square footage48total square footage 1504
City of Dallas permitResidential New Construction Permit
Sources: City of Dallas
Questions about 3623 Reed Ln
What is being built at 3623 Reed Ln?
A residential new-construction project was permitted at the address. The City of Dallas permit is RES-NEW-26-000491, dated March 23, 2026.
When was construction permitted at 3623 Reed Ln?
The City of Dallas issued the recorded residential new-construction permit on March 23, 2026.
How large is the new residential construction at 3623 Reed Ln?
The permit lists 1,456 square feet of air-conditioned space and a 48-square-foot porch, totaling 1,504 square feet.
What is the permit number for 3623 Reed Ln?
The City of Dallas permit number is RES-NEW-26-000491. It is dated March 23, 2026.
What's being built near Dallas Independent School District on S 2nd Ave?
A residential new-construction project was permitted at 3623 Reed Ln, about 177 meters from Dallas Independent School District at 4401 S 2nd Ave. The permit was filed on March 23, 2026.
Also being built nearby
All of 75210- 3620 Reed LnSep 24, 2026Service release no work · 39 m away
- 3630 Reed LnNov 5, 2026Hvac · 45 m away
- 3634 Reed LnOct 4, 2026Nsfaa-new 2story single family dwelling on vacant lot · 48 m away
- 3523 Carpenter AveOct 20, 2026Install new hvac system · 123 m away
- 4401 S 2nd Ave, Dallas, TX 75210 · Dallas Independent School DistrictMar 4, 2026Joseph j. rhoads learning center building additions & site work — renovation/alteration — existing school renovation (2,962 sq ft) consisting of renovating existing girls and boys restrooms, replacing some classrooms with new kitchen and cafeteria, as well as adding dry storage and a manager office · 177 m away
- 3622 Bertrand AveJun 19, 2026Replace 2.5 ton complete heat pump system · 201 m away
- 3714 Copeland StNov 17, 2026New construction · 211 m away
- 3710 Bertrand AveNov 16, 2020Construct new sfd · 224 m away
- 3520 Bertrand AveJul 25, 2025Nsfaa-adding 117 square feet of walk in closet and electrical · 228 m away
- 3722 Bertrand AveSep 19, 2025Gas test · 231 m away
- 3639 Pine StDec 30, 2020Construct new sfd · 230 m away
- 3651 Pine StNov 4, 2026Plumbing remodel · 237 m away