groundranger
Active · latest filing Oct 2026Commercial

4200 Metropolitan Ave

Dallas, TX 75210

Paul L. Dunbar Learning Center renovation permits filed

Permits filed with the City of Dallas on October 23, 2026, indicate renovation work at Paul L. Dunbar Learning Center at 4200 Metropolitan Ave. The work described includes a new front-entry canopy and marquee sign, building systems and security upgrades, and replacement of the staff parking lot and sidewalk.

Summarized from City of Dallas records · updated Oct 23, 2026

Projects
4
4 filings
Latest filing
Oct 23, 2026
since Oct 23, 2026
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000597
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000596
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000595
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Dsst disd paul l. dunbar learning center -provide new marquee sign at front of the school, replace exterior waterproofing and sealant, paint all previously painted exterior surfaces and power wash as required, provide new landscaping. construct new front entry canopy. perform mild detergent medium pressure wash on stained or mildewed facade. replace split ac units. provide/replace idf/mdf ac. replace ctp built up roof with gravel roofs. replace staff parking lot and sidewalk. mechanical and hvac improvements including new central station, and roof top units, grilles, diffusers, duct work, steam piping, water pump, refrigerant monitoring, boiler, exhaust fans, and controls. provide security updates, cameras, card access, card readers, door contacts, and secure entry vestibule. replace elevator controls, replace existing fire alarm system with new system and voice annunciator. replace existing chiller and evap tower with new 300 ton air cooled chiller, install sound attenuation fencing

    Dsst disd paul l. dunbar learning center -provide new marquee sign at front of the school, replace exterior waterproofing and sealant, paint all previously painted exterior surfaces and power wash as required, provide new landscaping. construct new front entry canopy. perform mild detergent medium pressure wash on stained or mildewed facade. replace split ac units. provide/replace idf/mdf ac. replace ctp built up roof with gravel roofs. replace staff parking lot and sidewalk. mechanical and hvac improvements including new central station, and roof top units, grilles, diffusers, duct work, steam piping, water pump, refrigerant monitoring, boiler, exhaust fans, and controls. provide security updates, cameras, card access, card readers, door contacts, and secure entry vestibule. replace elevator controls, replace existing fire alarm system with new system and voice annunciator. replace existing chiller and evap tower with new 300 ton air cooled chiller, install sound attenuation fencing

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001115
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 4200 Metropolitan Ave

What is being built at 4200 Metropolitan Ave in Dallas?

City of Dallas permit COM-ALT-ADD-25-001115 describes alterations and additions at Paul L. Dunbar Learning Center, including a new front-entry canopy, building upgrades, and replacement of the staff parking lot and sidewalk.

Is a new school being built at 4200 Metropolitan Ave?

The permit description identifies work at the existing Paul L. Dunbar Learning Center, including renovations and system replacements. It does not describe construction of a new school.

What improvements are planned for Paul L. Dunbar Learning Center?

The permit describes exterior work, new landscaping, HVAC and roof improvements, security updates, a new fire alarm system, and a new front-entry canopy and marquee sign.

Will the parking lot at Paul L. Dunbar Learning Center be replaced?

The permit description includes replacement of the staff parking lot and sidewalk. It does not provide a construction schedule.

When were permits filed for work at 4200 Metropolitan Ave?

Four City of Dallas permit records at the address were filed on October 23, 2026. The detailed alteration permit is COM-ALT-ADD-25-001115.

Are there other permits for the school project?

Three additional City of Dallas permits filed October 23, 2026, are listed as phase alteration/addition permits. Their records do not include descriptions of the work.

Also being built nearby

All of 75210

More parking structures in 75210, schools & daycares in 75210.

Get alerts for 4200 Metropolitan Ave