4300 Spring Ave
Dallas, TX 75210
4300 Spring Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 4300 Spring Ave, Dallas, TX 75210. The most recent, filed August 18, 2025, covers: “Gas test w repair”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4300 Spring Ave
What is being built at 4300 Spring Ave?
The latest filing (City of Dallas permit RES-PLM-25-003758, August 18, 2025) covers gas test w repair.
How many permits and filings does 4300 Spring Ave have?
1 filing across 1 project, from August 18, 2025 to August 18, 2025.
Is there other construction near 4300 Spring Ave?
Yes. Nearby filings include 4301 Spring Ave (new ac, May 27, 2025); 2809 Gay St (nsfaa new construction of a single family residential property, May 14, 2026); 2815 Gay St (install new 2ton heat pump hvac system with ductwork, Jun 25, 2026).
How do I get alerts for new permits at 4300 Spring Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75210- 4301 Spring AveMay 27, 2025New ac · 13 m away
- 2809 Gay StMay 14, 2026Nsfaa new construction of a single family residential property · 50 m away
- 2815 Gay StJun 25, 2026Install new 2ton heat pump hvac system with ductwork · 51 m away
- 4233 Spring AveJun 17, 2026Install new 3ton heat pump hvac system and associated duct work, exhaust fans, and dryer vent · 63 m away
- 2730 Morning AveOct 27, 2026New construction · 84 m away
- 2907 Morning AveSep 28, 2026Replace vented wall furnace · 88 m away
- 2906 Swanson StApr 13, 2026New construction · 116 m away
- 2731 Gay StApr 28, 2026Roof repair fixing various holes and adding new shingles · 121 m away
- 2815 Frazier StOct 8, 2026Nsfaa the project consists of the construction of a 43.31 square foot residential bathroom addition to the existing single-family residence. the work includes alllabor, materials, equipment, and coordination necessary to complete the addition in accordance with the approved construction documents and applicablebuilding codes · 123 m away
- 2726 Gay StJan 17, 2026Remove shingles and installing new 30 years shingels · 132 m away
- 2909 Frazier StJun 4, 2026Main panel upgrade · 145 m away
- 2724 Swanson StSep 17, 2025Driveway approach & sidewalk · 147 m away