4426 Metropolitan Ave
Dallas, TX 75210
Residential gas test permit at 4426 Metropolitan Ave
A residential plumbing permit for a gas test was filed at 4426 Metropolitan Ave in Dallas on February 9, 2026. The record does not describe new construction or identify an occupant.
Summarized from City of Dallas records · updated Feb 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 9, 2026
- since Feb 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4426 Metropolitan Ave
What is being built at 4426 Metropolitan Ave?
The City of Dallas record is for a residential plumbing permit covering a gas test, not a new-construction project. It was filed February 9, 2026.
Was a gas test permitted at 4426 Metropolitan Ave?
Yes. Permit RES-PLM-26-001523 is described as a gas test and was filed February 9, 2026.
When was the permit filed for 4426 Metropolitan Ave?
The City of Dallas permit was filed on February 9, 2026.
Is a new home being built at 4426 Metropolitan Ave?
The available record does not identify a new home or other construction. It describes a residential plumbing gas test.
Who is the occupant or owner at 4426 Metropolitan Ave?
The permit record does not list an occupant or owner.
Also being built nearby
All of 75210- 4422 Metropolitan AveAug 10, 2026New construction · 4 m away
- 4418 Metropolitan AveSep 4, 2025Nsfaa-this will be a single story sfr in dallas, 3 bed 2 baths 1700sqft home · 8 m away
- 4408 Metropolitan AveOct 1, 2026New construction residential · 17 m away
- 4406 Metropolitan AveJul 24, 2025Wire a new house · 19 m away
- 4415 Baldwin StDec 5, 2025Gas test · 70 m away
- 4502 Metropolitan AveOct 29, 2020Single family remodel · 73 m away
- 4507 Metropolitan AveJul 29, 2024Construct new sfd at 4507 metropolitan ave · 78 m away
- 4422 Baldwin StAug 15, 2025Installation of a 7.470 kw rooftop mounted photovoltaic system with 200a mpu and battery storage system · 81 m away
- 4418 Baldwin StMar 17, 2026New constriction residential · 82 m away
- 4410 Hamilton AveJun 30, 2026New construction · 92 m away
- 4523 Metropolitan AveAug 10, 2026New construction · 93 m away
- 4524 Metropolitan AveApr 28, 2026Replacing 2.5 ton gas complete system · 94 m away