1720 Morris St
Dallas, TX 75212
New single-family home permitted at 1720 Morris St
Dallas permits indicate a new single-family home is planned at 1720 Morris St. The new-construction permit was filed June 10, 2025, followed by demolition, electrical, plumbing and HVAC permits.
Summarized from City of Dallas records · updated Aug 14, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Aug 14, 2025
- since Jun 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsDemolition of primary residential structure with high reach excavator. we will use a water hose for dust control. lot will be left cleared to grade level
Demolition of primary residential structure with high reach excavator. we will use a water hose for dust control. lot will be left cleared to grade level
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 1720 Morris St
What is being built at 1720 Morris St in Dallas?
A City of Dallas permit describes new construction of a single-family home. The permit, RES-NEW-25-000064, was filed June 10, 2025.
Was a home demolished at 1720 Morris St?
Yes. A residential demolition permit filed June 25, 2025, describes removing the primary residential structure and clearing the lot to grade.
When was the new home permitted at 1720 Morris St?
The new-construction permit was filed June 10, 2025. Related electrical, plumbing and HVAC permits were filed between July 8 and August 14, 2025.
What other permits were filed for 1720 Morris St?
The records include an electrical permit describing a new home, a plumbing permit tied to the new-construction permit, and two residential mechanical permits for new HVAC. These were filed from July 8 through August 14, 2025.
Is construction complete at 1720 Morris St?
The records list permits for new construction and related work, but do not state whether construction is complete.
What is the permit number for the new home at 1720 Morris St?
The City of Dallas residential new-construction permit is RES-NEW-25-000064, filed June 10, 2025.
Also being built nearby
All of 75212- 1711 Morris StNov 3, 2025Construct new 8' cedar wood fence · 20 m away
- 1726 Kraft StSep 24, 2026New hvac and ductwork · 79 m away
- 3418 Navaro StJun 3, 2026New hvac installation · 89 m away
- 1727 Kraft StSep 1, 2026No work done (electrical meter release) · 92 m away
- 1711 Kraft StMay 28, 20262 - 3 ton units electric ductwork for both units · 92 m away
- 3424 Navaro StMay 27, 2026New hvac and ductwork · 104 m away
- 3400 Chihuahua StJun 10, 2026Electrical installation in new construction dwelling unit · 115 m away
- 3314 Navaro StAug 19, 2025Install hvac in a new build · 123 m away
- 3414 Vilbig RdJul 8, 2025Replace meter base · 132 m away
- 3421 Chihuahua StAug 6, 2026Service release no work this address is vacant · 136 m away
- 1805 Mcbroom StAug 13, 2026No work · 160 m away
- 1721 Dennison StJul 13, 2026Replace 3 ton condenser and coil · 163 m away
More demolitions in 75212.