Recent · latest filing Aug 2025Commercial
3100 Crossman Ave
Dallas, TX 75212
Commercial plumbing repair at 3100 Crossman Ave
A commercial plumbing permit at 3100 Crossman Ave covers repairing a slab leak and connecting it to the main line. The City of Dallas permit was filed on August 29, 2025.
Summarized from City of Dallas records · updated Aug 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 29, 2025
- since Aug 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3100 Crossman Ave
What work is planned at 3100 Crossman Ave in Dallas?
A City of Dallas commercial plumbing permit describes repairs to a slab leak and the main line.
When was the plumbing permit filed for 3100 Crossman Ave?
The permit was filed on August 29, 2025.
What is the permit number for work at 3100 Crossman Ave?
The permit number is COM-PLM-25-001508.
Is a new commercial building being built at 3100 Crossman Ave?
The available permit describes commercial plumbing repairs, not construction of a new building.
How much will the plumbing work at 3100 Crossman Ave cost?
The permit record does not list a project cost.
Also being built nearby
All of 75212- 3018 Crossman AveMay 15, 2025Electrical remodel · 90 m away
- 3119 N Winnetka AveMay 19, 2026Relocate gas meter · 97 m away
- 3123 N Winnetka AveMay 18, 2026Relocate gas meter · 97 m away
- 1211 Singleton Blvd · Hello Car Wash SingletonOct 3, 2025Installation of raceway and wiring for sight lighting. installation for point of cell power and vacuum power · 110 m away
- 3115 Borger StMay 7, 2025Fence the property around · 123 m away
- 3022 Borger StOct 1, 2026Paving contractor to construct a new concrete residential drive approach and concrete sidewalk for the single-family residence located at 3022 borger st. work includes: concrete drive approach: installation of a concrete drive approach measuring 16 ft wide by 10 ft long (160 sq ft). concrete sidewalk: installation of a concrete sidewalk measuring 4 ft wide by 50 ft long (200 sq ft). all work will be performed in accordance with city of dallas right-of-way standards, maintaining standard grade and alignment, with no surrounding ditch involvement. total flatwork construction area is 360 sq ft · 140 m away
- 1103 Singleton BlvdAug 7, 2026Mcr partition walls were removed, no electrical was removed or added, just simple removal to open up space.this permit is associated with a certificate of occupancy - #co-26-003696 · 142 m away
- 3014 N Winnetka AveFeb 12, 2026Demolition house · 143 m away
- 3223 N Winnetka AveMay 14, 2026Relocate gas meter · 157 m away
- 3212 N Winnetka AveMay 27, 2026Remove and install new carrier 80-ton chiller · 158 m away
- 3227 Borger StMar 18, 2026Two hvac systems gas 2 and 3 ton, ductwork, exhaust fans, vent hood and dryer · 182 m away
- 1019 Toronto StMay 14, 2026Relocate gas meter · 183 m away