Siding and window replacement filed at 3211 Hammerly Dr
A residential alteration at 3211 Hammerly Dr calls for replacing siding, removing some brick, and changing all windows. The City of Dallas permit record was filed on February 6, 2026, under permit RES-ALT-ADD-26-000215.
Summarized from City of Dallas records · updated Feb 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 6, 2026
- since Feb 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3211 Hammerly Dr
What work is planned at 3211 Hammerly Dr in Dallas?
The permit description calls for replacing siding, removing some brick to replace with siding, and changing all windows. The City of Dallas record was filed February 6, 2026.
Is a new home being built at 3211 Hammerly Dr?
The listed permit is for a residential alteration, not a new-home build. It describes siding and window work.
When was the permit filed for 3211 Hammerly Dr?
The City of Dallas permit was filed on February 6, 2026. Its number is RES-ALT-ADD-26-000215.
What is permit RES-ALT-ADD-26-000215 for?
The permit record describes residential alterations at 3211 Hammerly Dr: replacing siding, removing some brick for siding replacement, and changing all windows.
Is 3211 Hammerly Dr a commercial project?
The record identifies the project as residential and lists a Residential Alteration Addition Permit. The described work is siding and window replacement.
Also being built nearby
All of 75212- 3119 Hammerly DrFeb 5, 2026Nsfaa -alteration · 127 m away
- 4726 Pueblo StAug 4, 2026Relocate existing 200a main service panel from the interior of the residence to the exterior adjacent to the existing utility meter. existing utility meter to remain in place. extend and reconnect existing branch circuits as required. install grounding and bonding in accordance with the current nec and city of dallas requirements. no service upgrade is included · 129 m away
- 3327 Hammerly DrNov 8, 2026Electrical installation in new construction (final phase)previous permit withdrawn · 137 m away
- 3143 Palacios AveFeb 13, 2026Mcr with battery energy storage system01- duracell power center maxhybrid 15 kwh inverter and08- duracell dura5 dc-coupledbatteries · 144 m away
- 3223 Weisenberger DrOct 31, 2025Manual recreation 1601271048 · 170 m away
- 3119 Weisenberger DrMay 11, 2026This project consists of the complete demolition and removal of an existing single-family residential structure. all utilities (electric, gas, water, and sewer) have been properly disconnected and capped prior to demolition in coordination with the city of dallas and respective utility providers. demolition will be performed using mechanical methods with appropriate dust control measures in place · 210 m away
- 3326 Hammerly DrMar 24, 2026New build · 218 m away
- 3102 Weisenberger DrJul 12, 2025Gas line test · 233 m away
- 4905 Toronto StOct 31, 2025Nsfaa-detached garage addition · 274 m away
- 4801 Singleton BlvdNov 26, 2025Wired office and restroom · 277 m away
- 4819 Singleton BlvdJul 1, 2026Clean and show no electrical work done · 279 m away
- 3420 Hammerly DrMar 16, 2026Knocking down home to put parking lot later · 295 m away