3330 Peoria Ave
Dallas, TX 75212
Former takeout restaurant at 3330 Peoria Ave becomes office
A former takeout restaurant and pizzeria at 3330 Peoria Ave is changing to a small administrative office for a plumbing company. A City of Dallas permit was filed October 15, 2026, for the change of use. The existing approximately 350-square-foot building will remain, with no structural alterations or additions proposed.
Summarized from City of Dallas records · updated Oct 15, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 15, 2026
- since Oct 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsChange of use from a former take-out restaurant/pizzeria to a small administrative office for a plumbing company. the existing approximately 350-square-foot building, restroom, interior partitions, entrance, windows, plumbing fixtures, electrical system and exterior footprint will remain. the current owner performed interior and exterior painting only. no structural alterations, additions, new walls, demolition, or relocation of doors, windows, plumbing fixtures or electrical equipment is proposed. former restaurant equipment, counters, shelving, hood, steamer, warmer and related removable fixtures were removed before the current owner acquired the property. submitted plans document the previous restaurant configuration and the current administrative-office configuration
Change of use from a former take-out restaurant/pizzeria to a small administrative office for a plumbing company. the existing approximately 350-square-foot building, restroom, interior partitions, entrance, windows, plumbing fixtures, electrical system and exterior footprint will remain. the current owner performed interior and exterior painting only. no structural alterations, additions, new walls, demolition, or relocation of doors, windows, plumbing fixtures or electrical equipment is proposed. former restaurant equipment, counters, shelving, hood, steamer, warmer and related removable fixtures were removed before the current owner acquired the property. submitted plans document the previous restaurant configuration and the current administrative-office configuration
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3330 Peoria Ave
What is happening at 3330 Peoria Ave, Dallas?
A City of Dallas permit filed October 15, 2026, indicates the former takeout restaurant and pizzeria is changing to a small administrative office for a plumbing company.
Is a new restaurant opening at 3330 Peoria Ave?
The permit describes a change from a former takeout restaurant/pizzeria to an administrative office. It does not indicate a new restaurant is opening.
What business is moving into 3330 Peoria Ave?
The permitted use is a small administrative office for a plumbing company. The record does not name the company.
Is the building at 3330 Peoria Ave being demolished?
No demolition is proposed in the permit description. The existing approximately 350-square-foot building and its exterior footprint will remain.
When was the permit filed for 3330 Peoria Ave?
The City of Dallas permit, COM-ALT-ADD-26-002340, was filed October 15, 2026.
What changes are planned inside 3330 Peoria Ave?
The permit documents the change from the former restaurant configuration to an administrative-office configuration. It says no new walls, structural alterations, additions, or relocation of doors, windows, plumbing fixtures, or electrical equipment are proposed.
Also being built nearby
All of 75212- 3206 Peoria AveJan 22, 2026Gas test · 168 m away
- 3202 Peoria AveNov 25, 2025Gas test · 174 m away
- 3406 Weisenberger DrJul 6, 2026Electrical service repairs/ upgrade · 211 m away
- 3403 Weisenberger DrApr 14, 202650 gallon gas water heater · 219 m away
- 3126 Peoria AveNov 18, 202670ft gas re pipe including 2 appliance drops and also bring water heater up to city code · 219 m away
- 3223 Weisenberger DrOct 31, 2025Manual recreation 1601271048 · 228 m away
- 4726 Pueblo StAug 4, 2026Relocate existing 200a main service panel from the interior of the residence to the exterior adjacent to the existing utility meter. existing utility meter to remain in place. extend and reconnect existing branch circuits as required. install grounding and bonding in accordance with the current nec and city of dallas requirements. no service upgrade is included · 293 m away
- 3326 Hammerly DrMar 24, 2026New build · 341 m away
- 3119 Weisenberger DrMay 11, 2026This project consists of the complete demolition and removal of an existing single-family residential structure. all utilities (electric, gas, water, and sewer) have been properly disconnected and capped prior to demolition in coordination with the city of dallas and respective utility providers. demolition will be performed using mechanical methods with appropriate dust control measures in place · 346 m away
- 3327 Hammerly DrNov 8, 2026Electrical installation in new construction (final phase)previous permit withdrawn · 351 m away
- 3102 Weisenberger DrJul 12, 2025Gas line test · 357 m away
- 3420 Hammerly DrMar 16, 2026Knocking down home to put parking lot later · 362 m away
More demolitions in 75212, offices in 75212, restaurants in 75212.