3510 Mcbroom St
Dallas, TX 75212
Gas test permit filed at 3510 McBroom St
A residential plumbing permit for a gas test was filed at 3510 McBroom St on March 6, 2026. The City of Dallas record does not describe a new building or other construction work.
Summarized from City of Dallas records · updated Mar 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2026
- since Mar 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3510 Mcbroom St
What is being built at 3510 McBroom St in Dallas?
The City of Dallas record is for a residential plumbing permit for a gas test, filed March 6, 2026. It does not describe a new building.
What work is the permit for at 3510 McBroom St?
The permit description is “Gas test.” It is listed as a Residential Plumbing Permit.
When was the 3510 McBroom St permit filed?
The City of Dallas filed permit RES-PLM-26-002481 on March 6, 2026.
Is a new home being built at 3510 McBroom St?
The available record does not describe new home construction. It documents a residential plumbing permit for a gas test.
What kind of permit was issued for 3510 McBroom St, Dallas?
The City of Dallas record identifies it as a Residential Plumbing Permit, with the description “Gas test.”
Also being built nearby
All of 75212- 3517 Mcbroom StJun 4, 2025Rerouted gas to fix leak · 17 m away
- 3520 Mcbroom StOct 29, 2025Re-roof · 18 m away
- 3560 Mcbroom StFeb 18, 2026Gas line to pool heater · 88 m away
- 3561 Mcbroom StJun 9, 2026Meter replacement due to tree falling on overhead service lines-occupied residence with no power for 3 weeks now · 89 m away
- 3513 Nomas StFeb 2, 2026New hvac · 98 m away
- 3501 Nomas StNov 25, 2025We will install a heat pump and about 16 ducts for the unit · 100 m away
- 3518 Nomas StMay 12, 2025Rewiring of electrical circuitry throughout the residence is necessary due to extensive water damage that has compromised the integrity and safety of the existing wiring system.all electrical work will be performed in compliance with the 2023 national electrical code (nec) and is required to pass inspection by the city of dallas electrical inspector. all scheduled inspections will be hosted by a licensed journeyman or master electrician, asmandated by local and national code enforcement standards.electrical panel upgrade:the current main electrical panel, located in the garage, is a crouse hinds circuit breaker enclosure, a model that is no longer manufactured due to its history of electrical hazards and fire risks. the existing panel presents multiple code violations, including: lack of proper grounding and bonding absence of required whole-home surge protection presence of mismatched and incompatible breakers from various manufacturers that are not ul-listed or approved for installation in the current panelbecause of these hazards, a complete panel replacement and service upgrade is necessary. the new panel will be ul-listed, properly grounded, and equipped with surge protection as required under the guidelines · 112 m away
- 3435 Mcbroom StJul 24, 2025Electrical service upgrade · 121 m away
- 3430 Mcbroom StDec 8, 2025Gas test · 125 m away
- 3561 Nomas StJun 18, 2026Remove and replace roofing system · 131 m away
- 3406 Mcbroom StJun 1, 2026Pool heater gas line · 159 m away
- 3431 Morris StOct 29, 2025Replacing 3.5 ton heat pump system · 180 m away