New single-family home permitted at 3730 Gallagher St
A new single-family home is planned at 3730 Gallagher St in Dallas. The City of Dallas issued a residential new-construction permit on July 17, 2026, followed by a new plumbing permit on September 27, 2026.
Summarized from City of Dallas records · updated Sep 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 27, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3730 Gallagher St
What is being built at 3730 Gallagher St?
City of Dallas permits indicate a new single-family home is planned at the address. The residential new-construction permit is RES-NEW-26-001135.
When was the new home at 3730 Gallagher St permitted?
The City of Dallas issued the residential new-construction permit on July 17, 2026.
Is plumbing work permitted at 3730 Gallagher St?
Yes. A new residential plumbing permit, RES-PLM-26-010311, was filed on September 27, 2026.
What is the permit number for construction at 3730 Gallagher St?
The residential new-construction permit is RES-NEW-26-001135, dated July 17, 2026. The later plumbing permit is RES-PLM-26-010311.
Is a new house being built near Ryder Dallas Rack Installatoin?
City of Dallas records show a new single-family home permitted at 3730 Gallagher St. The listed Ryder Dallas Rack Installatoin landmark is at 3701 Norwich St, about 304 meters away.
Also being built nearby
All of 75212- 3718 Gallagher StSep 7, 2026Hvac new build · 19 m away
- 3735 Morris StNov 21, 2025Gas pressure test for atmos release · 76 m away
- 3723 Morris StMay 19, 2026Nsfaa proposed work includes a 105 sq ft concrete slab extension with saw-cut connection to the existing slab, installation of rebar dowels, prepared and compacted subgrade, and poured concrete with broom finish sloped for proper drainage. construction of a cedar wood pergola with 6x6 posts on proper footings, structural beams and rafters, and a framed roof assembly designed for alignment and structural integrity. installation of polycarbonate roofing panels with manufacturer-approved fasteners, proper overlap, sealing, and slope for water runoff. scope also includes application of a stain/sealer (if applicable), site cleanup, and completion of all work in accordance with standard construction practices · 77 m away
- 3719 Morris StJul 30, 2026Rsvp-new construction \| sfh \| 3719 morris st · 79 m away
- 3701 Morris StNov 3, 2026Water heater replacement · 90 m away
- 3718 Bickers StFeb 19, 2026Demolition sfdblade cleanclear debrisno tree removal · 90 m away
- 3710 Morris StJun 9, 2025Private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16 · 95 m away
- 3628 Gallagher StJul 6, 2026Gas test water heater repair · 184 m away
- 3711 Crane StNov 17, 2026Rsvp - new single-family dwelling · 194 m away
- 3704 Mcbroom StDec 18, 2025Demolition whole structure, structure is 20'6" x 30 · 209 m away
- 3606 Gallagher StJun 23, 2025Replace 2.5 ton complete gas system · 223 m away
- 3607 Morris StOct 5, 2026Nsfaa-sfh – new construction• 5 bedrooms• 4.5 bathrooms• 3909 sq ft living area · 237 m away