3902 Furey St
Dallas, TX 75212
Residential permits filed at 3902 Furey St
A City of Dallas plumbing permit filed Dec. 16, 2024, describes work at 3902 Furey St as “nsfd,” indicating a new single-family dwelling. Later records list an 8-foot fence permit filed July 25, 2025, and a residential mechanical permit filed Oct. 14, 2025.
Summarized from City of Dallas records · updated Oct 14, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Oct 14, 2025
- since Dec 16, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 3902 Furey St
What is being built at 3902 Furey St?
A Dec. 16, 2024, City of Dallas plumbing permit describes the work as “nsfd,” indicating a new single-family dwelling.
When was the first permit filed for 3902 Furey St?
The earliest listed filing is a residential plumbing permit dated Dec. 16, 2024. Its permit number is 2412161033_194715607-002_PL_1.
Was a fence permitted at 3902 Furey St?
Yes. A City of Dallas residential accessory structure permit filed July 25, 2025, lists an 8-foot fence. The permit number is RES-ACC-25-000252.
What work was listed in the latest permit for 3902 Furey St?
The latest listed filing is a residential mechanical permit dated Oct. 14, 2025. Its permit number is RES-MEC-25-003119.
How many permits are listed for 3902 Furey St?
The records list three City of Dallas permits: plumbing, an 8-foot fence, and residential mechanical work.
Also being built nearby
All of 75212- 3919 Furey StJul 22, 2025Gas test · 22 m away
- 3925 Furey StJul 7, 2025Gas test · 29 m away
- 3903 Vineyard DrJun 9, 2026Electrical panel replacement and meter base replacement · 112 m away
- 3463 Bernal DrOct 13, 2026Plumbing associated with permit #res-new-26-001695 · 117 m away
- 3906 Vineyard DrOct 23, 2026Sewer replacement · 125 m away
- 3910 Vineyard DrOct 21, 2025Complete installaton of a 5 ton electric system complete with ductwork, rough in and final inspeciton · 126 m away
- 3459 Bernal DrOct 27, 2026Electrical for new construction · 129 m away
- 4003 Furey StJul 24, 2025Gas meter relocate on behalf of atmos · 140 m away
- 4015 Furey StSep 5, 2025New construction residential · 157 m away
- 3822 Vineyard DrApr 16, 2026Demolition sfdblade cleanclear debrisno tree removal · 157 m away
- 3818 Vineyard DrJul 9, 20254 ton electric complete system with ductwork · 160 m away
- 4002 Soloman DrFeb 4, 2026Provide and install a complete mechanical system for anew construction home in accordance with approvedplans, local building codes, and manufacturerspecifications. scope includes layout, rough-in, and finalinstallation of hvac equipment, ductwork, ventilation,and related components. install heating and coolingunits, supply and return air ducts, registers, grilles,thermostats, condensate drainage, and exhaust systemsas required. perform system start-up, testing, andbalancing to ensure proper airflow, efficiency, andoccupant comfort. coordinate required inspections andprovide final commissioning upon completion · 162 m away