4021 Esmalda Dr
Dallas, TX 75212
Residential permits filed at 4021 Esmalda Dr
Permits indicate work for a new single-family dwelling at 4021 Esmalda Dr. Dallas filed plumbing and mechanical permits described as “NSFD” on March 22, 2024, followed by a new residential electrical permit on September 25, 2025.
Summarized from City of Dallas records · updated Sep 25, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Sep 25, 2025
- since Mar 22, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 4021 Esmalda Dr
What is being built at 4021 Esmalda Dr?
Dallas permit records indicate work for a new single-family dwelling, based on plumbing and mechanical permits described as “NSFD” filed March 22, 2024.
When were permits filed for 4021 Esmalda Dr?
The plumbing and mechanical permits were filed March 22, 2024. A new residential electrical permit was filed September 25, 2025.
Is a new home planned at 4021 Esmalda Dr in Dallas?
The city records include plumbing and mechanical permits described as “NSFD,” indicating a new single-family dwelling. They do not establish whether the home is complete.
What are the permit numbers for 4021 Esmalda Dr?
The electrical permit is RES-ELC-25-003352, filed September 25, 2025. The plumbing and mechanical permit IDs are 2403221030_188604321-002_PL_1 and 2403221030_188604321-002_ME_1, both filed March 22, 2024.
What is being built near Ryder Truck Rental in Dallas 75212?
At 4021 Esmalda Dr, about 338 meters from Ryder Truck Rental at 3701 Norwich St, permits indicate work for a new single-family dwelling.
Also being built nearby
All of 75212- 4016 Esmalda DrMar 18, 202686.5 feet long x 6 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 8 feet apart.- each post will be installed in maximizer concrete.- posts will be 9’ steel post (but only 6 feet will be above ground)- fence will be vertical. install 1x6x6 pre stained pickets's vertically to build board on board fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high.- includes installing 2 gate that are 36" wide for free!!- pre-stained color is dark walnut · 14 m away
- 4037 Esmalda DrDec 18, 2025Nsfaa carport · 27 m away
- 4026 Pringle DrNov 12, 2025Addition of 2nd story · 88 m away
- 4015 Pringle DrSep 28, 2026Replace 3 ton complete heat pump · 95 m away
- 4123 Esmalda DrOct 30, 2026Installation of approximately 60’ of new sidewalk and 12’ wide driveway approach · 175 m away
- 4127 Esmalda DrSep 17, 2026Replace 2.5 ton heat pump system · 182 m away
- 4126 Esmalda DrOct 12, 2026New hvac system · 182 m away
- 4132 Esmalda DrJul 1, 2025New build: 4132 esmalda · 192 m away
- 4111 Pringle DrJun 25, 2025Wiring of new construction residential · 193 m away
- 4119 Ladale DrSep 10, 2026New electrical for new construction home · 276 m away
- 4002 Soloman DrFeb 4, 2026Provide and install a complete mechanical system for anew construction home in accordance with approvedplans, local building codes, and manufacturerspecifications. scope includes layout, rough-in, and finalinstallation of hvac equipment, ductwork, ventilation,and related components. install heating and coolingunits, supply and return air ducts, registers, grilles,thermostats, condensate drainage, and exhaust systemsas required. perform system start-up, testing, andbalancing to ensure proper airflow, efficiency, andoccupant comfort. coordinate required inspections andprovide final commissioning upon completion · 292 m away
- 4010 Soloman DrJan 16, 2026Provide and install a complete mechanical system for a new construction home in accordance with approved plans, local building codes, and manufacturer specifications. scope includes layout, rough-in, and final installation of hvac equipment, ductwork, ventilation, and related components. install heating and cooling units, supply and return air ducts, registers, grilles, thermostats, condensate drainage, and exhaust systems as required. perform system start-up, testing, and balancing to ensure proper airflow, efficiency, and occupant comfort. coordinate required inspections and provide final commissioning upon completion · 293 m away