4040 Pipestone Rd
Dallas, TX 75212
Commercial plumbing permit lists a gas test
A commercial plumbing permit for a gas test was filed at 4040 Pipestone Rd on October 17, 2025. The City of Dallas record, COM-PLM-25-002216, does not describe additional work or a new building.
Summarized from City of Dallas records · updated Oct 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 17, 2025
- since Oct 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4040 Pipestone Rd
What is being built at 4040 Pipestone Rd?
The City of Dallas permit record does not describe a new building. It lists a gas test under commercial plumbing permit COM-PLM-25-002216, filed October 17, 2025.
What work is planned at 4040 Pipestone Rd in Dallas?
The only work listed is a gas test. The permit was filed October 17, 2025.
Is a gas line being installed at 4040 Pipestone Rd?
The permit description says “Gas test”; it does not list a gas line installation.
When was the permit for 4040 Pipestone Rd filed?
The City of Dallas filed commercial plumbing permit COM-PLM-25-002216 on October 17, 2025.
What work is planned near Turnpike 25 Parking Expansion?
A City of Dallas permit at 4040 Pipestone Rd lists a gas test. The record does not establish a connection to Turnpike 25 Parking Expansion, listed at 2322 French Settlement Rd.
Also being built nearby
All of 75212- 3890 La Reunion PkwyOct 29, 2025Install new enhanced grounding rod to e bonded at switchgear a · 98 m away
- 3875 La Reunion PkwySep 4, 2025Gas test · 124 m away
- 3950 La Reunion PkwyOct 19, 2026Alteration to existing property located at 3950 la reunion pkwy, dallas, tx 75212. removal of existing floor area and pour back of concrete pad to be added to the interior in order to support a large manufacturing machine · 141 m away
- 3845 La Reunion PkwyDec 10, 2025No, work is being done we are trying to get electricity restored · 254 m away
- 3801-3845 La Reunion Parkway · Pinnacle 3May 12, 2025400-source logistics — renovation/alteration — tenant improvements within existing shell building · 254 m away
- 3901 Pipestone Road · Airlite PlasticsNov 26, 2024Airlite plastics — renovation/alteration — renovation of interior warehouse and production spaces · 265 m away
- 3901 Pipestone RdMay 13, 2025Install gas line · 265 m away
- 3950 Bastille Road · Ta Dallas Turnpike LLCJun 26, 2024Krestmark tenant improvements — renovation/alteration — alterations of an existing tenant space. alteration are in 4 separate 2- story office/ break room pods · 273 m away
- 2104 French Settlement RdNov 3, 2026Bu zo the scope of work consists of installing a new pallet racking system inside an existing warehouse facility. the project includes the installation of 72 bays measuring 108" x 28" and 8 bays measuring 156" x 28", for a total of 936 pallet positions. the racking footprint covers approximately 1,755 square feet of floor area. work includes anchoring uprights to the existing concrete slab, assembling beams, wire decking, and all structural components in accordance with the stamped engineering plans and calculations. no modifications will be made to the building’s structural, electrical, mechanical, or plumbing systems. all installation will be performed by an insured and qualified crew following osha safety standards and manufacturer specifications. the racking system will be used for high?pile storage as defined by the fire code · 468 m away
- 2140 French Settlement RdNov 25, 2025Inspection of gas lines for gas service re-instatement · 480 m away
- 2150 French Settlement RdMar 4, 2026Gas test · 485 m away
- 2150 French Settlement · 2130-2150 French Owner LPApr 25, 2024Interior renovation for a spec office for rockhill management, llc — renovation/alteration — interior renovation of an existing office/warehouse facility · 485 m away