4819 Bernal Dr
Dallas, TX 75212
Drive-thru lane and pickup window planned at 4819 Bernal Dr
A commercial remodel at 4819 Bernal Dr includes a drive-thru lane, menu board and pickup window, according to a City of Dallas permit filed May 6, 2026. The work also includes changes to parking and traffic circulation, striping and minor site improvements. The permit does not propose a building expansion.
Summarized from City of Dallas records · updated May 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2026
- since May 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectBu zo dir commercial remodel including addition of drive-thru lane, menu board, and pickup window. work includes reconfiguration of parking, traffic circulation, striping, and minor site improvements. no building expansion proposed
Bu zo dir commercial remodel including addition of drive-thru lane, menu board, and pickup window. work includes reconfiguration of parking, traffic circulation, striping, and minor site improvements. no building expansion proposed
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 4819 Bernal Dr
What is being built at 4819 Bernal Dr?
A City of Dallas permit describes a commercial remodel adding a drive-thru lane, menu board and pickup window. It also lists parking and traffic-circulation changes.
Is a new drive-thru planned at 4819 Bernal Dr?
The permit filed May 6, 2026, includes an addition of a drive-thru lane, menu board and pickup window. It does not identify a business or tenant.
Will the building at 4819 Bernal Dr be expanded?
The permit description says no building expansion is proposed. The listed work includes site and parking changes.
When was the permit filed for 4819 Bernal Dr?
The City of Dallas filed permit COM-ALT-ADD-26-001107 on May 6, 2026.
What changes are planned for parking at 4819 Bernal Dr?
The permit describes reconfiguration of parking and traffic circulation, along with striping and minor site improvements.
Also being built nearby
All of 75212- 3603 Hammerly DrMay 14, 2025General repair, siding and 2 windowsreroof only - no layout changesno plan review requiredall subject to field inspectors’ approval.reroof only - no layout changesremove existing roof and install new roof.no structural changes allowed under this permit. fill cavity with insulation.persons performing solid waste/recycling collections including operating a vehicle transporting waste/recycling within the city of dallas are required to obtain a solid waste franchise from sanitation services. ordinance 18-32 states in part that handling solid waste within the city of dallas without a franchise is a violation of the city ordinance and may result in civil penalties of up to $2,000 for each violation. sanitation services is located at 3112 canton street, 2nd floor, dallas, texas 75226 · 69 m away
- 3502 Abilene StJul 8, 2026Gas test · 76 m away
- 3424 Hammerly DrFeb 11, 2026Demolishing of old building to put parking lot later · 142 m away
- 3420 Hammerly DrMar 16, 2026Knocking down home to put parking lot later · 145 m away
- 4754 Bernal DrFeb 19, 2026Building addition to put restaurant · 153 m away
- 4738 Bernal DrSep 18, 2025Gas testno repairs done, test required from gas company to turn service on · 189 m away
- 3708 Hammerly DrJan 7, 2026Complete hvac installation · 198 m away
- 3713 Hammerly DrSep 15, 2026Install mechanical for new construction · 200 m away
- 3717 Hammerly DrSep 10, 2026Roof all layers to deck · 205 m away
- 3326 Hammerly DrMar 24, 2026New build · 218 m away
- 4889 Bernal DrNov 30, 2025Replacing roof shingles · 247 m away
- 4719 Bernal DrDec 30, 2025Replace shinges to reroof · 253 m away