The records do not identify a new building or specific use at 5229 Singleton Blvd; they show commercial electrical permit activity. A commercial electrical permit was filed May 9, 2025, and a meter release permit, COM-ELC-26-000985, was filed March 9, 2026.
Summarized from City of Dallas records · updated Mar 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 9, 2026
- since May 9, 2025
- Largest scope
- —
- Listed value
- $2K
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 5229 Singleton Blvd
What is being built at 5229 Singleton Blvd?
The available City of Dallas records do not describe a new building or identify a project use. They show two commercial electrical permit filings.
What work is planned at 5229 Singleton Blvd in Dallas?
The latest record describes a meter release. An earlier commercial electrical permit was filed on May 9, 2025, but its description does not specify the work.
When was the latest permit filed for 5229 Singleton Blvd?
The latest listed filing is dated March 9, 2026. It is a commercial electrical permit for a meter release, COM-ELC-26-000985.
Is a new business opening at 5229 Singleton Blvd?
The permit records do not name a business or say that a new business is opening.
How many permits are on record for 5229 Singleton Blvd?
The City of Dallas records list two commercial electrical permit filings: one dated May 9, 2025, and a meter release filed March 9, 2026.
Also being built nearby
All of 75212- 5309 Singleton BlvdAug 14, 2026Plumbing work was completed already we are trying to get the rough in, top out, and final inspection inspected please let us know once inspection has been completed what is the next steps from here · 117 m away
- 2803 Chalk Hill RdJul 10, 2025No work · 199 m away
- 2923 Clymer StMar 30, 2026Electrical work for addition · 261 m away
- 2807 Kenesaw DrMay 23, 2025We will be removing the shingles down to the decking and replacing them with new composite shingles · 271 m away
- 2702 Ingersoll StJul 29, 2026Nsfaa new construction sfr · 271 m away
- 2703 Chalk Hill RdOct 27, 2026Clean and show, we are trying to show property off to new tenants · 299 m away
- 5414 Singleton BlvdJun 13, 2025Install. hvac system complete with duct work · 310 m away
- 3126 Bill Harrod StFeb 28, 20253126 bill harrod st (new construction 2,463 sq) · 325 m away
- 5000 Singleton BlvdJun 10, 2025Install new concrete pad for 750kva utility transformer. install new 1200amp 277/480v 3ph4w service feeder from transformer to new mdp. install new 1,200amp 277/480v 3ph4w mdp with gfci main breaker. new mdp will feed new equipment and re-feed existing main electrical panel. install grounding for new electrical service. install new 600amp 480v 3-phase circuit to feed new shredder equipment. install control wiring for equipment per manufacturer drawings · 327 m away
- 3123 Odessa StSep 12, 2025Installation of solar system roof mounted pv 11.76kw and battery · 334 m away
- 2809 Clymer StNov 12, 2026Complete hvac system for new construction · 355 m away
- 4960 Singleton BlvdOct 22, 2025Repair gas leak · 364 m away