1912 Abrams Pkwy
Dallas, TX 75214
Country club rest stop and pump station work at 1912 Abrams
City of Dallas permits indicate work for Lakewood Country Club, including a pump station and a covered rest stop addition listed as 1,800 square feet. The addition permit was filed November 6, 2025; a pump station permit followed on September 8, 2025. Later filings cover electrical work, plumbing and site utilities, with the latest dated September 29, 2026.
Summarized from City of Dallas records · updated Sep 29, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Sep 29, 2026
- since Jun 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsQteam new addition for 1811 auburn aveconstruction of a rest stop for lakewood country club. total covered square footage is 1,800sf
Qteam new addition for 1811 auburn aveconstruction of a rest stop for lakewood country club. total covered square footage is 1,800sf
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1912 Abrams Pkwy
What is being built at 1912 Abrams Pkwy?
Dallas permits indicate Lakewood Country Club site work, including a pump station and a covered rest stop addition listed as 1,800 square feet. The addition permit, COM-ALT-ADD-25-001662, was filed November 6, 2025.
Is Lakewood Country Club building a rest stop?
A November 6, 2025, permit describes construction of a rest stop for Lakewood Country Club and lists 1,800 square feet of covered space. The permit description refers to 1811 Auburn Ave.
What is the pump station permit for at 1912 Abrams Pkwy?
A September 8, 2025, Dallas permit describes a pump station for the Lakewood golf course. The permit number is COM-ALT-ADD-25-000875.
What work is happening near Muchacho Lakewood?
Permits for 1912 Abrams Pkwy indicate Lakewood Country Club work, including a rest stop addition and pump station. Muchacho Lakewood is listed nearby at 1900 Abrams Pkwy.
Are utilities being installed at 1912 Abrams Pkwy?
A Dallas commercial plumbing permit filed September 29, 2026, describes site utilities extending to within five feet of the building. Its permit number is COM-PLM-26-003837.
When were permits filed for the Lakewood Country Club work?
The earliest listed permits were filed June 11, 2025, for underground plumbing and storm and sanitary plumbing. The latest listed filing, for site utilities, was dated September 29, 2026.
Also being built nearby
All of 75214- 1908 Abrams Pkwy · Gri Lakewood, LLCJul 11, 2025Snarf's abrams rd — renovation/alteration — tenant interior renovations of 2,331 sq ft to create a sandwich shop · 14 m away
- 1906 Abrams PkwyOct 7, 2025Clean and show electric · 20 m away
- 1922 Abrams PkwyFeb 2, 2026We are open and received our cofo in april of 2025. during construction our address changed from 1924 abrams to 1922 abrams but the connection to the meter was already completed and the meter was upgraded to a 400amp meter. all of our paperwork was for 1922 abrams along with our txu and meter. recently the meter for 1924 went offline due and so did our power. which made us see that we are connected to 1924 instead of 1922. we want to have a service release on 1924 meter that we are connected to so we can restore power to the space while we work to have the 1922 meter upgraded (it is currently a 200amp meter) and everything switched over to the correct meter. we need this online as soon as possible as we have been without power for 5 days as of writing this. please call me if you need any more clarification 360.566.7099 · 34 m away
- 1922 Abrams Parkway · Gri Lakewood, LLC (first Washington Realty Inc.)Jun 13, 2024Petfolk lakewood — renovation/alteration — this project is an upfit of a unit in an existing one story building at 1923 abrams parkway dallas, texas 75214. the unit will be a pet care center, occupancy b · 34 m away
- 1924 Abrams PkwyFeb 12, 2026We are open and received our cofo in april of 2025. during construction our address changed from 1924 abrams to 1922 abrams but the connection to the meter was already completed and the meter was upgraded to a 400amp meter. all of our paperwork was for 1922 abrams along with our txu and meter. recently the meter for 1924 went offline due and so did our power. which made us see that we are connected to 1924 instead of 1922. we want to have a service release on 1924 meter that we are connected to so we can restore power to the space while we work to have the 1922 meter upgraded (it is currently a 200amp meter) and everything switched over to the correct meter. we need this online as soon as possible as we have been without power for 5 days as of writing this. please call me if you need any more clarification 360.566.7099 · 41 m away
- 1900 Abrams Pkwy · Lakewood Shopping CenterJan 8, 2026Muchacho lakewood — renovation/alteration — interior renovation/alteration of existing restaurant · 41 m away
- 6216 Junius StJul 14, 2026Install ductless mini-split hvac system including outdoor unit, indoor units, refrigerant piping, condensate drains, indoor/outdoor interconnecting cable, controls, startup, and associated mechanical work. line-voltage electrical by others · 72 m away
- 700 N Paulus AveDec 10, 2025Gas test and gas repairs · 106 m away
- 6342 La Vista DrOct 14, 2020Upgrade existing electrical service · 112 m away
- 6324 Gaston AveNov 19, 2025Gas pressure test for new service · 133 m away
- 6322 Gaston Ave · Greenway - Lakwood Partners, LPJan 15, 2024Pnc bank#lakewood square — renovation/alteration — existing vacant space, converting into a new pnc via an interior buildout, new finishes, layout, new plumbing in new locations, lighting, likely an upgraded electrical service, new ductwork, existing ahu, new mini ahu · 133 m away
- 6334 Gaston AveOct 29, 2020Service release no work · 134 m away