3000 Hillbrook Street
Dallas, TX 75214 · Lakewood Es Playground Ph 1 & 2, Disd - Lakewood Elementary School Renovation
Lakewood Elementary playground work and renovations registered
Two projects are registered at the multi-tenant site: playground and pedestrian improvements, and renovations to Lakewood Elementary School. The renovation was registered on March 1, 2024, and the playground project on June 5, 2025. The playground project covers approximately 39,000 square feet; the school renovation includes a secure vestibule, accessibility upgrades, a special education classroom upgrade, and corridor space converted to a flex room.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 5, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 5, 2025
- since Mar 1, 2024
- Largest scope
- 39,000 sf
- Estimated cost
- $980K
- state registration
Where this project stands
Inspected · closing outLakewood ES Playground Ph 1 & 2
39,000 sq ft · $475K est.
- RegisteredJun 5, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsSite work associated with new play areas and pedestrian amenities (approximately 39,000 square feet) — lakewood elementary school
TDLR project registrationRenovation/AlterationInspection Complete39,000 sq ft$475K est.- Project #
- TABS2025020620
- Tenant / owner
- Lakewood Es Playground Ph 1 & 2
- Design firm
- Pro
- Contact
- Pro
Renovation of an elementary school to include secure vestibule, accessibility upgrades at auditorium, upgrade of special ed. classroom, and conversion of corridor into flex room space. total scope of work includes approx. 2030 sq ft — disd lakewood elementary school
TDLR project registrationAdditions to Existing BuildingProject Closed2,030 sq ft$980K est.- Project #
- TABS2024012879
- Tenant / owner
- Disd - Lakewood Elementary School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3000 Hillbrook Street
What is being built at 3000 Hillbrook Street in Dallas?
Records list playground and pedestrian improvements, along with renovations to Lakewood Elementary School. The site has two registered projects.
Is Lakewood Elementary getting a new playground?
A project registered June 5, 2025, lists site work for new play areas and pedestrian amenities at Lakewood Elementary. It covers approximately 39,000 square feet.
What renovations are planned at Lakewood Elementary?
A project registered March 1, 2024, includes a secure vestibule, auditorium accessibility upgrades, an upgrade to a special education classroom, and converting corridor space into a flex room.
When were the Lakewood Elementary projects permitted?
The school renovation was registered with TDLR on March 1, 2024. The playground and pedestrian improvements were registered on June 5, 2025.
Are the Lakewood Elementary projects complete?
The TDLR record for the playground project lists its status as “Inspection Complete.” The school renovation record lists its status as “Project Closed.”
Also being built nearby
All of 75214- 3000 Hillbrook StOct 13, 2026Big d party rentals, llc will be constructing a 12x24x24 stage at lakewood elementary school on the black top, like it has done every year for this event for the past 5 years
- 6722 Lake Circle DrNov 3, 2020Install water heater · 117 m away
- 6722 Vanderbilt AveJul 20, 202616.810 kw dc roof mount solar with backup batteries · 122 m away
- 6716 Lake Circle DrOct 27, 2020Demolition sfd · 124 m away
- 6717 Lake Circle DrSep 12, 20253.5 ton system replacement - upstairs system · 133 m away
- 6712 Vanderbilt AveJun 9, 2026Mcr with battery install of 22.96kw solar panels on roof of dwelling and 3) sonnehome battery 11 20kwh · 135 m away
- 6701 Vanderbilt AveDec 8, 2020Gas line to pool equipment · 155 m away
- 6732 Sondra DrSep 11, 2025Dedicated underground gas line for a generator · 169 m away
- 6707 Meadow Lake AveDec 5, 2025Need to wire electrical for additional pool cabanana · 175 m away
- 6716 Sondra DrJul 13, 2026Replacement of 5-ton evaporator coil · 184 m away
- 3435 Wendover RdOct 14, 2026Installation of level 2 ev charging station on garage wall · 190 m away
- 6717 Sondra DrDec 16, 2025Private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16 · 193 m away