5770 Abrams Rd
Dallas, TX 75214
Exterior wall veneer work and a 90-foot fence permitted
A Dallas permit filed June 22, 2026, covers replacement of part of the exterior wall assembly at 5770 Abrams Rd, including the thin brick veneer, substrate, drainage mat, cement board and flashing. The permit says the existing stucco will remain and the work has no structural modifications; a separate permit filed October 1, 2025, covers a 90-foot fence.
Summarized from City of Dallas records · updated Jun 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 22, 2026
- since Oct 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsZo bc this project is related to an insurance claim that is currently in litigation involving the property owner, public adjusters, and legal counsel. the exposed tyvek weather barrier noted by the city of dallas occurred as a result of the ongoing insurance dispute.immediately after receiving notification from the city of dallas, the temporary weather barrier conditions were corrected and the tyvek weather barrier was properly reinstalled and secured.once the insurance claim is settled between the insurance carrier and the property owner, the exterior wall assembly within the permitted work area will be reconstructed as follows:replacement of 5/8" plywood substrateinstallation of drainage matinstallation of 1/2" cement boardinstallation of 3/8" thin brick veneerinstallation of associated flashing componentsthe existing three-coat stucco system shall remain in place and will not be removed or modified. only the thin brick veneer portion of the exterior wall assembly will be removed and replaced.there are no structural modifications included in this scope of work. additionally, there are no modifications to windows, canopies, roofing systems, or roof drainage systems.the scope of work is limited strictly to the removal and replacement of the exterior wall assembly within the areas identified in the original permit drawings on sheets a4.02 and a6.01
Zo bc this project is related to an insurance claim that is currently in litigation involving the property owner, public adjusters, and legal counsel. the exposed tyvek weather barrier noted by the city of dallas occurred as a result of the ongoing insurance dispute.immediately after receiving notification from the city of dallas, the temporary weather barrier conditions were corrected and the tyvek weather barrier was properly reinstalled and secured.once the insurance claim is settled between the insurance carrier and the property owner, the exterior wall assembly within the permitted work area will be reconstructed as follows:replacement of 5/8" plywood substrateinstallation of drainage matinstallation of 1/2" cement boardinstallation of 3/8" thin brick veneerinstallation of associated flashing componentsthe existing three-coat stucco system shall remain in place and will not be removed or modified. only the thin brick veneer portion of the exterior wall assembly will be removed and replaced.there are no structural modifications included in this scope of work. additionally, there are no modifications to windows, canopies, roofing systems, or roof drainage systems.the scope of work is limited strictly to the removal and replacement of the exterior wall assembly within the areas identified in the original permit drawings on sheets a4.02 and a6.01
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 5770 Abrams Rd
What is being built at 5770 Abrams Rd?
A June 22, 2026, Dallas permit describes limited exterior wall work, including replacement of the thin brick veneer and related wall materials. A separate 2025 permit covers a 90-foot fence.
When was the exterior wall work permitted?
The City of Dallas permit, COM-ALT-ADD-26-000528, was filed June 22, 2026.
Is the entire stucco exterior being replaced?
No. The permit says the existing three-coat stucco system will remain. The work is limited to the thin brick veneer portion of the wall assembly in the areas identified in the permit drawings.
Does the exterior work include structural changes?
No. The permit description says there are no structural modifications, and no changes to windows, canopies, roofing or roof drainage systems.
How large is the fence planned for 5770 Abrams Rd?
A permit filed October 1, 2025, covers installation of 90 feet of six-foot board-on-board fence.
What work is planned near Chatime on Dallas's Abrams Road?
A permit at 5770 Abrams Rd covers limited exterior wall work and a separate fence permit. Chatime is listed at 6464 E Northwest Hwy, about 147 meters away; the records do not indicate a connection between the locations.
Also being built nearby
All of 75214- 5804 Abrams RdFeb 4, 2026Replace grease trap · 10 m away
- 5834 Abrams RdJul 22, 2026Electrical release for clean and show permit · 19 m away
- 5836 Abrams RdDec 8, 2025Gas pressure test · 20 m away
- 6423 Fisher RdDec 5, 2025Gas test. need gas release. lock box by the inside of the gate. code is 1986 · 145 m away
- 6464 E Northwest HwyFeb 6, 2026Installation of drains and new waterlines · 147 m away
- 6464 Northwest Hwy · Medallian Center Partners LP 4874Aug 26, 2024Yardstick dog hotel — renovation/alteration — tenant finishout including restrooms, offices, dog kennels · 147 m away
- 6464 E Northwest Hwy · Medallion Center Partners LPOct 14, 2026Gas test and relies · 147 m away
- 6520 E NW Hwy · 5441 Rufe Snow LtdMay 7, 2024Popeye's nw hwy conversion - dallas, tx — renovation/alteration — conversion to popeye's · 160 m away
- 6520 E Northwest HwyNov 11, 2026Repair fire damage of existing popeyes restaurant · 160 m away
- 6526 E Northwest HwyDec 18, 2025Adding onto existing first floor duct work. adding 2 restroom exhaust fans and 1 kitchen exhaust roughing in and finish out · 167 m away
- 6526 E Northwest Highway · IH 30 Northwest Gmd LtdJun 4, 2025Bandana brew i — renovation/alteration — interior renovation of an existing building · 167 m away
- 6532 E Northwest HwyNov 21, 2025Replacement of 10 feet of sewer line · 174 m away