Recent · latest filing Nov 2025Residential
6125 Martel Ave
Dallas, TX 75214
Drain repairs permitted at 6125 Martel Ave
A residential plumbing permit for drain repairs at 6125 Martel Ave was filed on November 18, 2025. The City of Dallas record does not specify the scope of the repairs or a project value.
Summarized from City of Dallas records · updated Nov 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2025
- since Nov 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6125 Martel Ave
What work is permitted at 6125 Martel Ave?
A City of Dallas residential plumbing permit lists drain repairs. The record does not provide further details about the work.
When was the drain repair permit filed at 6125 Martel Ave?
The permit was filed on November 18, 2025.
What is the permit number for 6125 Martel Ave?
The permit number is RES-PLM-25-007697.
Is a new building being constructed at 6125 Martel Ave?
The available City of Dallas record is for drain repairs, not new building construction.
How much will the work at 6125 Martel Ave cost?
The permit record does not report a project value or cost estimate.
Also being built nearby
All of 75214- 6121 Martel AveNov 12, 2025Replacing 50 gallon gas water heater located in closet · 5 m away
- 6100 Martel AveJan 12, 2026Installation of 50-gallon gas water heater in the laundry room closet · 33 m away
- 6112 Penrose AveJun 2, 2026Remove and replace approx. 210 linear feet of wood fence, 8ft tall, with galvanized steel posts and 3 pedestrian gates · 82 m away
- 6102 Penrose AveJun 28, 2026Electrical remodel/ addition · 85 m away
- 6125 Penrose AveJun 10, 202550 gallon gas water heater · 93 m away
- 6119 Penrose AveJul 1, 2025Remove old hvac systems and replace with new 4 ton and 5 ton units · 94 m away
- 6111 Penrose AveSep 23, 2026Remove and replace approximately 40 feet of the existing 4-foot-wide sidewalk along the front of the property. the existing concrete will be demolished and removed, the area will be regraded as needed, and a new concrete sidewalk will be poured.the existing driveway approach on the right side of the property, including the sidewalk section that crosses the approach, will also be removed and replaced. the approach will be widened from its current width · 95 m away
- 6103 Penrose AveAug 12, 2026Replacing a 4 ton gas complete system · 97 m away
- 6114 Revere PlFeb 3, 2026Replace driveway approach and city walk · 104 m away
- 6106 Revere PlOct 22, 2026Install 8ft fence \| 6106 revere · 106 m away
- 6211 Martel AveMay 4, 2026Mcr installation of residential roof-integrated pv solarshingle system (bipv) consisting of 100 modules - 5.7 kw dc · 130 m away
- 6059 Martel AveJul 8, 2026Remove and replace laminated shingles · 140 m away