6153 Danbury Ln
Dallas, TX 75214
Residential plumbing work at 6153 Danbury Ln
City of Dallas permits show sewer repiping at this residential property on February 26, 2026, followed by a gas pressure test on October 26, 2026. The records list plumbing work, not a new building project.
Summarized from City of Dallas records · updated Oct 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 26, 2026
- since Feb 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6153 Danbury Ln
What is happening at 6153 Danbury Ln in Dallas?
City of Dallas records list residential plumbing work: a sewer repipe and a gas pressure test.
What work was permitted at 6153 Danbury Ln?
A sewer repipe was listed on permit RES-PLM-26-002204, filed February 26, 2026. A gas pressure test was listed on permit RES-PLM-26-011511, filed October 26, 2026.
Is a new house being built at 6153 Danbury Ln?
The records provided do not show a new home project. They list residential plumbing permits for a sewer repipe and a gas pressure test.
When was the sewer repipe permit filed for 6153 Danbury Ln?
The City of Dallas record shows the sewer repipe permit, RES-PLM-26-002204, was filed February 26, 2026.
When was the gas pressure test permitted at 6153 Danbury Ln?
The City of Dallas record shows the gas pressure test permit, RES-PLM-26-011511, was filed October 26, 2026.
Also being built nearby
All of 75214- 6150 Highgate LnFeb 25, 2026Residential foundation repair to install 40 piers per engineering report/diagram · 75 m away
- 6132 Highgate LnSep 6, 2026Electrical wiring throughout · 79 m away
- 6158 Highgate LnJul 8, 2026Roof replacement · 81 m away
- 6151 Highgate LnSep 14, 2020Install water heater in garage · 88 m away
- 6159 Highgate LnSep 19, 2025Replace existing cast iron with pvc under the house · 93 m away
- 6116 Danbury LnApr 15, 2026Water heater replaced · 97 m away
- 6127 Highgate LnSep 11, 2020Replace or modify existing hvac · 96 m away
- 6151 Chesley LnJul 7, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <5 feet new 3?4” emt conduit to power the level 2 ev charger at 48amp constant draw · 101 m away
- 6121 Highgate LnAug 27, 2025Replace 5 ton heat pump · 104 m away
- 6145 Chesley LnAug 4, 2026Building sewer and drains replacment · 108 m away
- 6152 Chesley LnMar 27, 2026Reroof: remove shingle, install new underlayment, flashing vents, and shingles · 112 m away
- 6115 Highgate LnSep 9, 2026X install 15 total pilings (7 exterior, 2 exterior with concrete breakouts, 6 tunnel 44 lf to · 114 m away