6250 Kenwood Ave
Dallas, TX 75214
6250 Kenwood Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 6250 Kenwood Ave, Dallas, TX 75214. The most recent, filed December 30, 2020, covers: “Remodel existing plumbing”.
Compiled from City of Dallas records · updated Dec 30, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Dec 30, 2020
- since Dec 30, 2020
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 6250 Kenwood Ave
What is being built at 6250 Kenwood Ave?
The latest filing (City of Dallas permit 2012303020, December 30, 2020) covers remodel existing plumbing.
How many permits and filings does 6250 Kenwood Ave have?
2 filings across 2 projects, from December 30, 2020 to December 30, 2020.
How much is the construction at 6250 Kenwood Ave worth?
Permits at this address list about $35 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6250 Kenwood Ave?
Yes. Nearby filings include 6247 Kenwood Ave (130' water yard service, Nov 12, 2026); 6256 Kenwood Ave (intall toilet, install 2 sink faucets, short lavatories adjustment. new mixing and shower head, Jul 20, 2026); 6240 Kenwood Ave (282 lf of 8ft cedar fencing., when measured from inside of yard, Jul 20, 2026).
How do I get alerts for new permits at 6250 Kenwood Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6247 Kenwood AveNov 12, 2026130' water yard service · 17 m away
- 6256 Kenwood AveJul 20, 2026Intall toilet, install 2 sink faucets, short lavatories adjustment. new mixing and shower head · 17 m away
- 6240 Kenwood AveJul 20, 2026282 lf of 8ft cedar fencing., when measured from inside of yard · 29 m away
- 6231 Kenwood AveJan 26, 2026Panel upgrade, meter base, overhead · 58 m away
- 6246 Ellsworth AveNov 24, 2020Demolition sfd · 97 m away
- 6270 Ellsworth AveJan 29, 2026Tear off existing shingles and replace with owens corning duration in desert rose · 111 m away
- 6211 Kenwood AveDec 24, 2025Installed new navien tankless and flow tech with flood prevention · 114 m away
- 6307 Martel AveJul 17, 2026New pool · 123 m away
- 6222 Ellsworth AveNov 18, 2020Construct new sfd · 129 m away
- 6218 Ellsworth AveNov 10, 2026Mcr install inground steel and gunite swimming pool only · 138 m away
- 6223 Ellsworth AveOct 9, 2026Install new construction plumbing · 138 m away
- 6212 Ellsworth AveSep 23, 2026Residential roof replacement · 152 m away