6300 E Mockingbird Ln
Dallas, TX 75214 · Cendera Bank
Cendera Bank remodel and office addition on Mockingbird Lane
Permits indicate that Cendera Bank at 6300 E Mockingbird Ln is remodeling its existing building, removing a drive-through canopy and adding office space. The project was registered with TDLR on October 3, 2026, and a City of Dallas alteration and addition permit was filed October 21, 2026.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 21, 2026
- since Oct 3, 2026
- Largest scope
- 4,960 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Approved · construction starts Dec 1, 2026Cendera Bank - Dallas
4,960 sq ft · $1.5M est.
- RegisteredOct 3, 2026
- Plan review
- ConstructionDec '26 – Sep '27
- Inspected
- Closed
A 10-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsDemolition of existing drive through canopy, interior remodel to existing space and addition of office space
Demolition of existing drive through canopy, interior remodel to existing space and addition of office space
City of Dallas permitCommercial Alteration Addition PermitRemodel of existing building — cendera bank - dallas
TDLR project registrationRenovation/AlterationReview Complete4,960 sq ft$1.5M est.- Project #
- TABS2027002685
- Tenant / owner
- Cendera Bank - Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 6300 E Mockingbird Ln
What is being built at 6300 E Mockingbird Ln?
Permits indicate a remodel of the existing Cendera Bank building, including removal of its drive-through canopy and an office-space addition. The City of Dallas permit is COM-ALT-ADD-26-002581, filed October 21, 2026.
Is a new Cendera Bank opening on Mockingbird Lane?
The records describe a remodel of an existing building, not a new bank opening. Cendera Bank - Dallas is named in a TDLR registration filed October 3, 2026.
What is the estimated cost of the Cendera Bank remodel?
The TDLR registration lists an estimated project cost of $1.5 million. This is the applicant's estimate for the project.
What's being remodeled near Mn8 Dallas on Mockingbird Lane?
Cendera Bank at 6300 E Mockingbird Ln, about 56 meters from Mn8 Dallas, has permits for an interior remodel, canopy demolition and office-space addition. The city permit was filed October 21, 2026.
How much space is included in the Cendera Bank project?
The TDLR registration lists 4,960 square feet for the renovation and alteration project. It was filed October 3, 2026, under project number TABS2027002685.
Also being built nearby
All of 75214- 6333 E. Mockingbird Lane · Mockingbird CommonsMar 17, 2025Studio b — renovation/alteration — interior renovation of existing tenant space · 56 m away
- 6333 E. Mockingbird · Reg8 Mockingbird Commons LLCMar 19, 2024Ogle — renovation/alteration — renovate current lease space · 56 m away
- 6333 East Mockingbird Lane · Reg8 Mockingbird Commons LLCDec 3, 2025Mn8 dallas, tx — new construction — installation of electrical vehicle charging station. consisting of 5 alpitronic hyc400 dual port dispensers, 6 smart poles, 1 electrical switchgear and 1 utility transformer · 56 m away
- 6333 E Mockingbird LnApr 20, 2026Installing new electrical car chargers · 56 m away
- 6330 E Mockingbird LnMay 12, 20264123 suite number. meso maya. disconnect relocation service needed · 92 m away
- 6330 E Mockingbird Lane · Adx Real Estate LLCOct 22, 2025Total wine and more — renovation/alteration — full interior remodel with new exterior canopy, lift. 24,415 sq ft · 92 m away
- 6355 E Mockingbird LnMar 5, 2026Installing new clearance bar using existing base of old clearance bar · 105 m away
- 6308 Winton StMar 30, 2026Gas test for atmos to release meter · 107 m away
- 6260 E Mockingbird Lane · Comerica Bank- Michael C. VenetisDec 31, 2024Comerica bank pavement repairs — renovation/alteration — the scope of work consists of mill and overlay of the existing asphalt pavement only. no other work is proposed. the existing building will remain the same · 121 m away
- 6344 Winton StJul 1, 2026Re-roof (shingles only) · 138 m away
- 6265 St Moritz AveSep 19, 2025Natural gas meter release · 163 m away
- 6253 St Moritz AveSep 8, 2025Gas relay/gas repipe · 188 m away