5-ton gas HVAC system replacement at 6327 Goliad Ave
A residential mechanical permit indicates a 5-ton gas complete system is being replaced at 6327 Goliad Ave. The City of Dallas permit was filed September 28, 2026 (permit RES-MEC-26-005384).
Summarized from City of Dallas records · updated Sep 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 28, 2026
- since Sep 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6327 Goliad Ave
What work is permitted at 6327 Goliad Ave in Dallas?
A City of Dallas residential mechanical permit describes replacement of a 5-ton gas complete system. The permit, RES-MEC-26-005384, was filed September 28, 2026.
Is a new building going up at 6327 Goliad Ave?
The available permit is for replacing a 5-ton gas complete system, not for construction of a new building. It was filed September 28, 2026.
When was the HVAC permit filed for 6327 Goliad Ave?
The City of Dallas filed residential mechanical permit RES-MEC-26-005384 on September 28, 2026.
What kind of HVAC system is being replaced at 6327 Goliad Ave?
The permit description says a 5-ton gas complete system is being replaced.
What is the permit number for work at 6327 Goliad Ave?
The permit number is RES-MEC-26-005384. It covers replacement of a 5-ton gas complete system and was filed September 28, 2026.
Also being built nearby
All of 75214- 6323 Goliad AveJul 2, 2026Replace 2- 40 gallon gas water heaters · 11 m away
- 6328 Goliad AveNov 4, 2020Install water heater · 14 m away
- 6319 Goliad AveJan 5, 2026Drain line replacement in yard 70ft · 22 m away
- 6345 Goliad AveJul 21, 2026Install 6 piers · 50 m away
- 6344 Goliad AveMar 18, 2026Repair of storm-damaged electrical service risers and meter bases at duplex (6344-6346 goliad ave). equipment to be resecured or replaced in same location. no service upgrade · 52 m away
- 6326 Lakeshore DrMar 10, 2026Reroof · 93 m away
- 6316 Lakeshore DrAug 14, 2026Repair 5 foot of exposed drain line in the wall.will need to cut out existing drain arm due to a crack in the line and run new pvc piping with new fittings to stub out wall so that p trap can be connected to sink drain. others to repair any sheet rock that needs to be open in order to access drain and tie onto good material · 98 m away
- 6342 Lakeshore DrJun 8, 2025Replacing water heater 50 gal · 103 m away
- 6321 Belmont AveDec 16, 20258 feet fence in the perimeter of the prloject and 3 door gates. 1 rear and 2 in the front · 106 m away
- 6335 Lakeshore DrSep 14, 2020Gas test · 108 m away
- 6259 Goliad AveJan 28, 2021Gas relay or repair with test · 110 m away
- 6311 Belmont AveJul 21, 2026Install 8' cedar fence on steel posts · 113 m away