6335 Malcolm Dr
Dallas, TX 75214
6335 Malcolm Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6335 Malcolm Dr, Dallas, TX 75214. The most recent, filed September 14, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Sep 14, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 14, 2020
- since Sep 14, 2020
- Largest scope
- —
- Listed value
- $1K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 6335 Malcolm Dr
What is being built at 6335 Malcolm Dr?
The latest filing (City of Dallas permit 2009143073, September 14, 2020) covers install water heater.
How many permits and filings does 6335 Malcolm Dr have?
1 filing across 1 project, from September 14, 2020 to September 14, 2020.
How much is the construction at 6335 Malcolm Dr worth?
Permits at this address list about $1K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6335 Malcolm Dr?
Yes. Nearby filings include 6341 Malcolm Dr (remodel existing plumbing, Oct 14, 2020); 6330 Malcolm Dr (construct swimming pool and spa, Nov 19, 2020); 6322 Malcolm Dr (gas line for pool heater, Oct 27, 2026).
How do I get alerts for new permits at 6335 Malcolm Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6341 Malcolm DrOct 14, 2020Remodel existing plumbing · 17 m away
- 6330 Malcolm DrNov 19, 2020Construct swimming pool and spa · 17 m away
- 6322 Malcolm DrOct 27, 2026Gas line for pool heater · 36 m away
- 6351 Malcolm DrJan 5, 2021Demolition sfd · 44 m away
- 6350 Malcolm DrJan 3, 2021Demolition sfd · 46 m away
- 6317 Malcolm DrOct 6, 2026New sfd · 50 m away
- 6355 Malcolm DrJul 8, 2025Installation of a residential 26kw generac generator · 56 m away
- 6362 Malcolm DrNov 13, 2020Sewer relay · 79 m away
- 6365 Malcolm DrNov 10, 2026Gas test · 83 m away
- 6366 Malcolm DrMar 11, 2026Install new construction electrical work · 90 m away
- 6367 Mccommas BlvdJun 13, 2025Installing a 4ton gas complete system 16seers3ton gas complete system 16seers both 96% furnaces total $21,400new duct · 134 m away
- 6290 Malcolm DrSep 11, 2025Rip and replace existing approach and sidewalk per city standards · 139 m away