Residential repairs at 6406 Danbury Ln
City of Dallas permits show residential repair work at 6406 Danbury Ln, including foundation, plumbing, electrical and mechanical work. The latest listed permit was filed April 6, 2026, for insulation on outside refrigerant lines and conduit over a control wire.
Summarized from City of Dallas records · updated Apr 6, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Apr 6, 2026
- since Aug 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 6406 Danbury Ln
What is being built at 6406 Danbury Ln?
The listed permits describe repairs and other work at a residence, not a new building. Work includes foundation repairs, plumbing, electrical work and mechanical work.
When was the latest permit filed for 6406 Danbury Ln?
The latest listed filing was April 6, 2026. Permit RES-MEC-26-001512 covers replacing insulation on outside refrigerant lines and installing conduit over a control wire.
Are there foundation repairs at 6406 Danbury Ln?
Yes. Two City of Dallas permits describe foundation repairs: one filed September 17, 2025, for 15 pilings, two CMU supports and shimming 225 square feet, and another filed December 18, 2025, for 12 pilings.
Is plumbing work permitted at 6406 Danbury Ln?
Yes. A permit filed August 26, 2025, describes a gas line to the house and a new water heater. Another, filed February 23, 2026, is for a sewer relay.
What electrical work is listed for 6406 Danbury Ln?
A City of Dallas residential electrical permit, RES-ELC-26-000195, was filed January 12, 2026. Its description is listed as electrical work.
Was an alteration permit filed for 6406 Danbury Ln?
Yes. Permit RES-ALT-ADD-25-000613 was filed August 7, 2025, to complete work started under permit 2411131131.
Also being built nearby
All of 75214- 6418 Danbury LnJul 16, 2026Upgrade service from 150 amp to 320 amp and from overhead to underground · 30 m away
- 5014 Abrams RdNov 16, 2026Electrical installation in new addition · 38 m away
- 5018 Abrams RdJul 1, 2026New sewer line from house to city · 43 m away
- 6434 Danbury LnSep 12, 2025Properly remove and replace roof as per specs · 73 m away
- 6422 Chesley LnAug 27, 2026Roof replacement · 125 m away
- 6419 Dunstan LnSep 15, 2026Replace existing 4-ton gas split hvac system with new 4-ton 22 seer system · 137 m away
- 6355 Danbury LnJul 27, 20264 ton base horizontal gas system · 140 m away
- 6441 Chesley LnOct 28, 2026Excavated and trenched up to 15 linear feet in the backyard to replace damaged pvc sewer piping and the existing clean out assembly, correcting the pipe slope and restoring proper drainage. also excavated beneath the pier-and-beam foundation and replaced up to 23 linear feet of cast-iron sewer piping with new pvc, connecting it to the existing sewer system. the existing pvc yard sewer line was left in place · 145 m away
- 6445 Chesley LnOct 21, 2020Construct new pergola & fire pit · 151 m away
- 6436 Dunstan LnSep 3, 2026Gas test · 155 m away
- 6347 Danbury LnOct 19, 202615ft tunnel to repair a slab leak · 156 m away
- 6405 Highgate LnNov 4, 2025Gas test only · 161 m away