6434 E Lovers Ln
Dallas, TX 75214
Water-line repiping permitted at 6434 E Lovers Ln
A City of Dallas residential plumbing permit filed April 27, 2026, covers repiping water lines under the pier-and-beam house at 6434 E Lovers Ln. The permit record identifies the work as residential plumbing, not new home construction.
Summarized from City of Dallas records · updated Apr 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 27, 2026
- since Apr 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6434 E Lovers Ln
What is being built at 6434 E Lovers Ln in Dallas?
The City of Dallas permit covers repiping water lines under the existing pier-and-beam house. It does not describe new construction.
When was the plumbing work permitted at 6434 E Lovers Ln?
The City of Dallas record was filed April 27, 2026.
What does permit RES-PLM-26-004409 cover?
It covers repiping water lines under the pier-and-beam house at 6434 E Lovers Ln.
Is a new house being built at 6434 E Lovers Ln?
The permit record describes water-line repiping under an existing house, not construction of a new house.
What type of permit was filed for 6434 E Lovers Ln?
The City of Dallas record lists it as a residential plumbing permit filed April 27, 2026.
Also being built nearby
All of 75214- 6442 E Lovers LnFeb 24, 2026Approach for drive way · 33 m away
- 6467 Glennox LnSep 22, 2026Demolition existing structure \| 6467 glennox ln · 104 m away
- 6464 E Lovers LnFeb 20, 2026Installing 15 steel pilings · 127 m away
- 5211 Rexton LnOct 10, 2025Hvac changeout – consolidate from two hvac systems to one 4-ton system. the home currently has a 1.5-ton system servicing the master bedroom; that system will be removed and its ductwork tied into the new 4-ton system. existing ductwork will be reused where possible. system serves the main portion of the home · 162 m away
- 5204 Rexton LnAug 24, 2026Plumbing for addition bathroom and laundry downstairs bathroom upstairs · 175 m away
- 6457 Highgate LnApr 8, 2026Install new 40 gallon electric water heater · 181 m away
- 6463 Highgate LnMar 30, 2026Roof replacement · 186 m away
- 6431 Highgate LnSep 7, 2026Replace restroom plumbing drains · 187 m away
- 6448 Highgate LnNov 10, 2025Foundation repair · 192 m away
- 6462 Highgate LnJul 31, 2025Add 8 outlets at kit area 5 switches 4 can lights kit exhaust fan · 201 m away
- 6468 Highgate LnAug 10, 202640 gal water heater · 206 m away
- 6415 Highgate LnNov 17, 2025Replacing a 4 ton gas complete system · 207 m away