6677 Gaston Ave
Dallas, TX 75214
6677 Gaston Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 6677 Gaston Ave, Dallas, TX 75214. The most recent, filed May 26, 2025, covers: “Replace section of existing sidewalk on pearson dr. 120lnft x 4' wide.approved by conservation district by sam eskander. 5/23/2025”.
Compiled from City of Dallas records · updated May 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 26, 2025
- since May 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace section of existing sidewalk on pearson dr. 120lnft x 4' wide.approved by conservation district by sam eskander. 5/23/2025
Replace section of existing sidewalk on pearson dr. 120lnft x 4' wide.approved by conservation district by sam eskander. 5/23/2025
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 6677 Gaston Ave
What is being built at 6677 Gaston Ave?
The latest filing (City of Dallas permit RES-DSW-25-000120, May 26, 2025) covers replace section of existing sidewalk on pearson dr. 120lnft x 4' wide.approved by conservation district by sam eskander. 5/23/2025.
How many permits and filings does 6677 Gaston Ave have?
1 filing across 1 project, from May 26, 2025 to May 26, 2025.
Is there other construction near 6677 Gaston Ave?
Yes. Nearby filings include 6671 Gaston Ave (residential reroof of the main house and secondary structure. tear off existing composition (asphalt) shingles and replace with lightweight natural slate roofing (60% galcar / 40% vermont black), including new underlayment and flashing. no changes to roof framing, Nov 6, 2026); 6653 Gaston Ave (sewer relay, Dec 31, 2020); 6700 Gaston Ave (install new hvac, Nov 2, 2020).
How do I get alerts for new permits at 6677 Gaston Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 6671 Gaston AveNov 6, 2026Residential reroof of the main house and secondary structure. tear off existing composition (asphalt) shingles and replace with lightweight natural slate roofing (60% galcar / 40% vermont black), including new underlayment and flashing. no changes to roof framing · 17 m away
- 6653 Gaston AveDec 31, 2020Sewer relay · 67 m away
- 6700 Gaston AveNov 2, 2020Install new hvac · 76 m away
- 6706 Gaston AveDec 1, 2025Gas water heater replacement in basement · 87 m away
- 6707 Gaston AveMar 10, 2026Nsfaa replacing 2 doors - like for like/same for same · 96 m away
- 6641 Gaston AveSep 16, 2025New gas relay from meter to pool heater · 101 m away
- 6714 Gaston AveDec 7, 2020Install water heater · 102 m away
- 6620 Gaston AveSep 21, 2026Replacing two (2) 50 gallon gas water heaters with two (2) 50 gallon electric water heaters · 104 m away
- 6682 Avalon AveJun 27, 2025New sidewalk off of side walk gate to back yard · 133 m away
- 6658 Avalon AveSep 16, 2026Replace existing hvac equipment · 140 m away
- 6633 Country Club CirJun 11, 2026Replace existing hvac system only (no ductwork) · 143 m away
- 6625 Gaston AveAug 25, 2026Wire lights & equipment on swimming pool · 146 m away